Secondary Critical Path in a Fuzzy Project Network

Journal Title: Scholars Journal of Physics, Mathematics and Statistics - Year 2014, Vol 1, Issue 2

Abstract

In a fuzzy project network, the higher risk path is called possible critical path. Secondary critical path is one of the possible critical path in fuzzy project network and it plays an important role in the project scheduling, risk analysis and time-cost trade-off problems in fuzzy environment. In this paper, triangular fuzzy numbers are used to express the operation times for all activities in fuzzy project network. We propose a method to find secondary critical path(s) in a fuzzy project network using the fuzzy free float. RM approach is used to rank fuzzy numbers to find fuzzy critical path. Two examples are given to describe the method.

Authors and Affiliations

K. Usha Madhuri, N. Ravi Shankar

Keywords

Related Articles

Carbon dioxide Capture and Sequestration to Mitigate Greenhouse Effect

Climate change is a major challenge. Secure, reliable and affordable energy supplies are needed for economic growth, but increases in the associated carbon dioxide (CO2) emissions are the cause of major concern. Carbon d...

The Optimized Operation 0f the Oilfield Water Injection System Based on Complex Method

The optimized operation model of the oilfield water injection system which optimized to the water injection station was established in this paper, and the objective function of the model made minimum energy consumption o...

On The Ternary Quadratic Diophantine Equation x2+ y2-xy=103z2

The ternary quadratic Diophantine equation represented by is analyzed for its non-zero distinct integer solutions. A few interesting properties between the solutions and special figurate numbers are obtained.

Adaptive Learning Rate SGD AlgorithmforSVM

Stochastic gradient descent (SGD) is a simple and effective algorithm for solving the optimization problem of support vector machine, where each iteration operates on a single training example. The run-time of SGD does n...

More on gbsb*-Closed Sets in Topological Spaces

Using the concept of gbsb* -open sets and gbsb*-closed sets, we introduce and study the topological properties of gbsb*- interior and gbsb*-closure of a set, gbsb*-derived sets, gbsb*-border, gbsb*-frontier and gbsb*-ext...

Download PDF file
  • EP ID EP383401
  • DOI -
  • Views 111
  • Downloads 0

How To Cite

K. Usha Madhuri, N. Ravi Shankar (2014). Secondary Critical Path in a Fuzzy Project Network. Scholars Journal of Physics, Mathematics and Statistics, 1(2), 53-60. https://europub.co.uk/articles/-A-383401