Secondary Critical Path in a Fuzzy Project Network

Journal Title: Scholars Journal of Physics, Mathematics and Statistics - Year 2014, Vol 1, Issue 2

Abstract

In a fuzzy project network, the higher risk path is called possible critical path. Secondary critical path is one of the possible critical path in fuzzy project network and it plays an important role in the project scheduling, risk analysis and time-cost trade-off problems in fuzzy environment. In this paper, triangular fuzzy numbers are used to express the operation times for all activities in fuzzy project network. We propose a method to find secondary critical path(s) in a fuzzy project network using the fuzzy free float. RM approach is used to rank fuzzy numbers to find fuzzy critical path. Two examples are given to describe the method.

Authors and Affiliations

K. Usha Madhuri, N. Ravi Shankar

Keywords

Related Articles

Existence of positive solutions for boundary value problems for a class of nonlinear high-order differential equation

In this paper, we investigate a kind of boundary value problem of nonlinear high-order differential equation. Making use of the fixed point theorems on cone and by constructing the correction function, we obtain the exis...

A Class of Reflected BSDE with Integrable Parameters

In this paper, we establish an existence and uniqueness result for solutions to one dimensional reflected backward stochastic differential equations (RBSDEs) with only integrable parameters, where the generator is -Ho...

Multiple Linear Regression using Centre Mean and Actual Value – A Comparative Approach

This work compared the performance of a multiple linear regression using the actual and centre mean values. The comparison was based on error analysis on both methods using different comparative Statistics. Nigerian gros...

Rationalized Haar collocation method for solving singular nonlinear Lane-Emden type equations

In this study we have proposed the Rationalized Haar (RH) collocation method for the solution of Lane-Emden equations arising in astrophysics as singular initial value problems. In order to test the applicability, accura...

Observation on the Binary Quadratic Equation 3x2-8xy+3y2+2x+2y+6=0

The binary quadratic equation is studied for its non-trivial integral solutions. The recurrence relations satisfied by the solutions x and y are given. A few interesting properties among the solutions are presented.

Download PDF file
  • EP ID EP383401
  • DOI -
  • Views 133
  • Downloads 0

How To Cite

K. Usha Madhuri, N. Ravi Shankar (2014). Secondary Critical Path in a Fuzzy Project Network. Scholars Journal of Physics, Mathematics and Statistics, 1(2), 53-60. https://europub.co.uk/articles/-A-383401