Selection of the Contractor for the Construction of the Cinere Jagorawi (Cijago) Section Ii Toll Road, West Java Indonesia
Journal Title: Engineering and Technology Journal - Year 2024, Vol 9, Issue 11
Abstract
Choosing a contractor for construction project work is not an easy job, because it requires accuracy in its determination, including in the work of the Cijago Toll Road Section II. Therefore, a method is needed, one of which is the Analytical Hierarchy Process (AHP) method to support decisions taken by the Ministry of PUPR as the Owner. Based on the respondents' assessment using the ahp method in tables 3 and 4 above, it can be seen that the selected contractor is PT.LMA. Because it has the highest value of 0.697 compared to PT.PP (0.245) and PT.HK (0.058). This assessment is based on 10 predetermined criteria.
Authors and Affiliations
Nurlaelah , Denni Chaniago,
The Contribution of Green Roofs in the Achievement of Sustainable Development Goals
Green roofs are eco-friendly systems designed to deliver environmental, economic and social benefits while they enhance the aesthetic appeal of buildings. Their construction on rooftop of buildings in urban communities i...
Effects of Information and Communication Technology Adoption on University Competitive Advantage via Education Quality a Field Study on Science & Technology and Hadhramout Universities
The current study aimed to determine the effect of information and communication technology adoption on university competitive advantage via education quality in Yemenis Universities. For the purposes of this study, the...
Improving Results of TF-IDF based Retrieval System using Co-reference Resolution and Pronoun Substitution
Information Retrieval systems involve the process of retrieving relevant information based on user queries. TF-IDF is one of the most popular techniques of Information Retrieval. It is widely used and been successful in...
PROBLEM SOLVING AND REHABILITATION OF THE SPELEOLOGICAL OBJECT OF LARGER DIMENSIONS WHICH APPEARED DURING THE EXCAVATION OF THE "POČITELJ" TUNNEL
The "Počitelj" tunnel was built as part of the section of the highway Mostar North - the border with the Republic of Croatia on the corridor Vc, the section Počitelj - Bijača, the subsection Počitelj - Zvirovići with a l...
Review on the Mechanical Properties of Pineapple Leaf Fiber (PALF) Reinforced Epoxy Resin Based Composites
Synthetic materials possess with several drawbacks as most of the cases they are not environmental friendly where the scientists and researchers are very much concern about the environmental issues. That’s why alternativ...