Selection of the Contractor for the Construction of the Cinere Jagorawi (Cijago) Section Ii Toll Road, West Java Indonesia
Journal Title: Engineering and Technology Journal - Year 2024, Vol 9, Issue 11
Abstract
Choosing a contractor for construction project work is not an easy job, because it requires accuracy in its determination, including in the work of the Cijago Toll Road Section II. Therefore, a method is needed, one of which is the Analytical Hierarchy Process (AHP) method to support decisions taken by the Ministry of PUPR as the Owner. Based on the respondents' assessment using the ahp method in tables 3 and 4 above, it can be seen that the selected contractor is PT.LMA. Because it has the highest value of 0.697 compared to PT.PP (0.245) and PT.HK (0.058). This assessment is based on 10 predetermined criteria.
Authors and Affiliations
Nurlaelah , Denni Chaniago,
Impacts of On-board Energy Storage Devices on the Energy Consumption of Train Operations
Urban rail transit systems consume significant electrical power, with traction accounting for 50% of the total energy (from China Urban Rail Transit Association [1]). As operational mileage and vehicle counts rise, so do...
Aeroelastic Structural Analysis to Calculate Symmetrical Divergence Modes of an Aircraft Wing Using Aerodynamic Lifting Line Theory
This work explores the use of numerical matrix iteration to determine an aircraft wing's divergence speed using the aerodynamic span effects approach. The present work begins with the construction of equilibrium equation...
SERIAL VISION AS A CHARACTER FORMING ELEMENT OF VISUAL CORRIDORS DIPONEGORO STREET SALATIGA
Diponegoro Street is one of the main roads in Salatiga City, where there are still many buildings from the Dutch Colonial and vegetation in the form of large trees which visually gives its own characteristics and can des...
Delays Factors for Construction Projects in South of Iraq
This study seeks to identify and categorize the factors responsible for delays in construction projects in southern Iraq. Using a sequential research approach that includes a literature review, interviews, and surveys, d...
ESTIMATE FRICTION FACTOR FOR POLYPROPYLENE PIPES
The major losses of fluid flow in plastic pipes due to friction are usually few or negligible in some cases, and this is due to the assumption that the value of the friction factor is small (small roughness). This work a...