Significant Mitigation Measures for Critical Factors of Cost Overrun in Highway Projects of Pakistan

Journal Title: Engineering, Technology & Applied Science Research - Year 2018, Vol 8, Issue 2

Abstract

Stakeholders of the construction industry and academia are often facing problems of cost overrun. It has been observed that many constructions of highway projects are not completed at the approved cost due to certain factors. The objective of this research is to identify the cost overrun critical factors involved in highway projects with their significant mitigation measures. In this regard, literature review helped to identify 64 factors of cost overrun. Based on these 64 common factors, a preliminary survey was carried out among 30 selected respondents of highway projects to identify the critical factors of cost overrun and its possible mitigation measures. Results of the preliminary study reported 8 critical factors and 42 possible mitigation measures for the identified factors. Another questionnaire was established on the findings of the preliminary survey and was distributed among 350 stakeholders of highway projects to identify the significant mitigation measures of finding critical factors of cost overrun. In total, 8 significant mitigation measures were identified as causative and critical factors of cost overrun. The findings of this research would be helpful for the construction practitioners who are dealing with cost overrun issues in the highway projects of Pakistan.

Authors and Affiliations

S. Sohu, A. H. Abdullah, S. Nagapan, A. A. Jhatial, K. Ullah, I. A. Bhatti

Keywords

Related Articles

Effect of Cement and Compaction on the Physicochemical Behavior of a Material in the Region of Sidi Bel Abbes

Soil treatment describes the procedure under which a soil acquires certain characteristics that did not originally have. This paper is focused in the field of road earthworks and the treatment of a material found in the...

Exploitation of Nanoindentation and Statistical Tools to Investigate the Behavior of Materials

The determination of the performance of materials requires the characterization of materials at scales: macro, micro and nanoscale. Among the most common experimental methods one can find the instrumented indentation tes...

Constrained K-Means Classification

Classification-via-clustering (CvC) is a widely used method, using a clustering procedure to perform classification tasks. In this paper, a novel K-Means-based CvC algorithm is presented, analysed and evaluated. Two addi...

A Modified Approach of OPTICS Algorithm for Data Streams

Data are continuously evolving from a huge variety of applications in huge volume and size. They are fast changing, temporally ordered and thus data mining has become a field of major interest. A mining technique such as...

Controller Design For DFIG Driven By Variable Speed Wind Turbine Using Static Output Feedback Technique

This paper describes the controller design for a DFIG based wind energy generation system using the static output feedback technique through the LMI Toolbox. The features of the DFIG, its converters and their controllers...

Download PDF file
  • EP ID EP168369
  • DOI -
  • Views 212
  • Downloads 0

How To Cite

S. Sohu, A. H. Abdullah, S. Nagapan, A. A. Jhatial, K. Ullah, I. A. Bhatti (2018). Significant Mitigation Measures for Critical Factors of Cost Overrun in Highway Projects of Pakistan. Engineering, Technology & Applied Science Research, 8(2), -. https://europub.co.uk/articles/-A-168369