Significant Mitigation Measures for Critical Factors of Cost Overrun in Highway Projects of Pakistan

Journal Title: Engineering, Technology & Applied Science Research - Year 2018, Vol 8, Issue 2

Abstract

Stakeholders of the construction industry and academia are often facing problems of cost overrun. It has been observed that many constructions of highway projects are not completed at the approved cost due to certain factors. The objective of this research is to identify the cost overrun critical factors involved in highway projects with their significant mitigation measures. In this regard, literature review helped to identify 64 factors of cost overrun. Based on these 64 common factors, a preliminary survey was carried out among 30 selected respondents of highway projects to identify the critical factors of cost overrun and its possible mitigation measures. Results of the preliminary study reported 8 critical factors and 42 possible mitigation measures for the identified factors. Another questionnaire was established on the findings of the preliminary survey and was distributed among 350 stakeholders of highway projects to identify the significant mitigation measures of finding critical factors of cost overrun. In total, 8 significant mitigation measures were identified as causative and critical factors of cost overrun. The findings of this research would be helpful for the construction practitioners who are dealing with cost overrun issues in the highway projects of Pakistan.

Authors and Affiliations

S. Sohu, A. H. Abdullah, S. Nagapan, A. A. Jhatial, K. Ullah, I. A. Bhatti

Keywords

Related Articles

Relevance and Applicability of Multi-objective Resource Constrained Project Scheduling Problem: Review Article

Resource-Constrained Project Scheduling Problem (RCPSP) is a Non Polynomial (NP) - Hard optimization problem that considers how to assign activities to available resources in order to meet predefined objectives. The prob...

Simulation Studies on Switching Table based DTC and Fuzzy Rule based DTC for Three-Phase Squirrel Cage Induction Motor

This paper describes a study of Switching Table Direct Torque Control (ST-DTC) and Fuzzy Rule based Direct Torque Control (FR-DTC) in case of a three phase induction motor. The hysteresis band and the switching table use...

Using Neural Networks to Predict the Hardness of Aluminum Alloys

Aluminum alloys have gained significant industrial importance being involved in many of the light and heavy industries and especially in aerospace engineering. The mechanical properties of aluminum alloys are defined by...

A New Contribution in Reducing Electric Field Distribution Within/Around Medium Voltage Underground Cable Terminations

Ιn medium voltage cables, the stress control layers play an important part in controlling the electric field distribution around the medium voltage underground cable terminations. Underground cable accessories, used in m...

A Review on Machine Translation in Indian Languages

Machine translation (MT) is considered an important task that can be used to attain information from documents written in different languages. In the current paper, we discuss different approaches of MT, the problems fac...

Download PDF file
  • EP ID EP168369
  • DOI -
  • Views 245
  • Downloads 0

How To Cite

S. Sohu, A. H. Abdullah, S. Nagapan, A. A. Jhatial, K. Ullah, I. A. Bhatti (2018). Significant Mitigation Measures for Critical Factors of Cost Overrun in Highway Projects of Pakistan. Engineering, Technology & Applied Science Research, 8(2), -. https://europub.co.uk/articles/-A-168369