SINGLE OBJECTIVE FOR AN INTEGER PARTIAL FLEXIBLE OPEN SHOP SCHEDULING PROBLEM USING DEVELOPED ANT COLONY OPTIMIZATION

Abstract

As an augmentation of the classical mechanical open shop scheduling problem, the Integer partial flexible open shop scheduling problem (IPFOSP) assumes an important role in genuine production systems. In IPFOSP, an operation is permitted to be prepared on in excess of one elective machine. It has been turned out to be an emphatically NP-hard problem. Ant colony optimization (ACO) has been turned out to be a successful approach for managing IFOSP. Since, the key ACO has two essential bothers including low computational efficiency and local ideal. In defect these two brothers, a developed ant colony optimization (DACO) is proposed to propel the make span for IPFOSP. The accompanying perspectives are done on our developed ant colony optimization algorithm: select machine govern problems, instate uniform appropriated mechanism for ants, change pheromone’s coordinating mechanism, select hub method, and refresh pheromone’s mechanism. The genuine production instance and two plans of well –known benchmark instances are inspected and correlations with some unique approaches conform the viability of the proposed DACO. The results reveal that our proposed DACO can give better arrangement in a sensitive computational time.

Authors and Affiliations

Keywords

Related Articles

The Effect of Temperature and Thermodynamics Studies on The Removal of Heavy Metal by using Adsorbent

The need for waste water treatment has intensified in the recent past with the advent of industrial revolution. The major contaminants of water are heavy metals of which chromium, used in leather and electroplating indus...

Crashworthiness Behaviour of Capped Cylindrical Aluminium Tubular Structures Subjected to Lateral Compression

Metallic cylindrical tubular elements have been prominent as an impact kinetic energy absorbing structures in various vehicles for their progressive deformation behaviour, long stroke and substantial energy absorbing abi...

Model and Analysis of Desktop Wind Tunnel

This paper is on model and analysis of desktop wind burrow. Wind Tunnel (WT) is equipment used to research a communication between rigid body flows in WT that can be performed in term of observing physical stream phenome...

Measuring Productivity Index with Objective Matrix (OMAX) Method in the Diecasting Aluminum Industry

Productivity in the manufacturing industry has a very important role, the manufacturing industry must have good productivity, this aims to improve the quality of the company and also increase profits for the company....

CONCERN OF CONSTRUCTION INDUSTRY TOWARDS OCCUPATIONAL SAFETY AND HEALTH ISSUES

The construction industry is the most important sector in the development of the country after agriculture sector in India. Apart from this, it is the one which has been neglecting the laws which are to be followed for i...

Download PDF file
  • EP ID EP377257
  • DOI -
  • Views 62
  • Downloads 0

How To Cite

(2018). SINGLE OBJECTIVE FOR AN INTEGER PARTIAL FLEXIBLE OPEN SHOP SCHEDULING PROBLEM USING DEVELOPED ANT COLONY OPTIMIZATION. International Journal of Mechanical and Production Engineering Research and Development (IJMPERD ), 8(3), -. https://europub.co.uk/articles/-A-377257