Stakeholder Risk Analysis Based on PMBOK to Improve Time Performance of Grand Batavia Tangerang Project

Journal Title: Engineering and Technology Journal - Year 2024, Vol 9, Issue 08

Abstract

A construction project is a series of activities limited by resources and time to achieve construction results with good quality standards. Each project stage is inseparable from various risks and uncertainties that affect quality and quantity. Construction projects do not always run smoothly and often face problems related to the stakeholders' influence. The Grand Batavia project has numerous internal and external stakeholders involved, and the project has experienced delays in project completion. Researchers take parameters in time performance by analyzing the stakeholder risks in a project. Therefore, the project time can be properly achieved. This study aims to determine the risk factors and steps or appropriate actions for stakeholder risks based on PMBOK 2013 to improve project time performance on subsequent projects.

Authors and Affiliations

Mohamad Sobirin ,

Keywords

Related Articles

An Experimental Investigation of the Effects MQL Using Nanofluids on Surface Roughness of Hard Milling Process

High cutting force and cutting heat are challenging problems that need to be overcome for the hard milling process. Minimum quantity lubrication (MQL) has been shown to be effective and suitable for use in hard milling d...

WIRELESS SENSOR NETWORK LOCALIZATION TECHNIQUES PERFORMANCE

A large number of inexpensive, small sensors make up a wireless sensor network. The collection and transmission of data is one of the crucial functions of a sensor network. In the greater part of the applications, it is...

Implementation of Data Mining to Find Association Patterns of Tracer Study Data Using Apriori Algorithm

Knowing the distribution of alumni from a university is very useful as an evaluation material and a benchmark for teaching and learning activities at related universities. One way to get the distribution of alumni is to...

Modelling and Sensitivity Analysis of Influencing Parameters in Displacement of Dynamic Bodies

The mathematical modeling in relation to the Six-degree freedom system of train suspension is developed and simulated for their dynamic characteristics. The important challenge in the suspension system is vertical displa...

Evaluation of Spoiler Design on the Aerodynamic Performance of an Energy-Efficient Car Prototype Body

The aerodynamic performance of the prototype body shape of an energy-efficient car can be analyzed from the coefficient of drag (Cd) and coefficient of lift (Cl) values ​​arising from the airflow profile on the vehicle b...

Download PDF file
  • EP ID EP743253
  • DOI 10.47191/etj/v9i08.45
  • Views 19
  • Downloads 0

How To Cite

Mohamad Sobirin, (2024). Stakeholder Risk Analysis Based on PMBOK to Improve Time Performance of Grand Batavia Tangerang Project. Engineering and Technology Journal, 9(08), -. https://europub.co.uk/articles/-A-743253