Structural Renovation Design Study for Shanghai Rail Transit Line 3/4 Joint-rail Project at Baoshan Road Station

Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 1

Abstract

[Objective] To enhance train throughput capacity and reduce safety risk at Baoshan Road Station in Shanghai rail transit, a track joint-rail renovation is necessary, requiring concurrent reinforcement of station structure. Thus the key issues in station structure renovation and design, countermeasures, and control on operational impact are sorted. [Method] The overview of Baoshan Road Station renovation project is presented, outlining design principles and confirming the design methodology. A code-exceeding structural performance design is conducted to validate the seismic resistance after reinforcement, and the tailored adaptive reinforcement plan for Baoshan Road Station structure is proposed, addressing critical challenges encountered during the design process along with their solutions. To ensure normal station operation during construction period, a phased construction organization plan is introduced. [Result & Conclusion] The renovated Baoshan Road Station meets the requirements of additional tracks. Through structural reinforcement, the station seismic resistance can meet requirements of current regulations. Phased station structure engineering can effectively lower various impacts on station operation.

Authors and Affiliations

Tianrong SUN

Keywords

Related Articles

Research Focus at Different Stages of Urban Rail Transit Prophase Works in the New Era

[Objective] In the future, China′s urban development will shift from construction-orientation to governance-orientation. As an important part of the Chinese-style modern social governance system, urban planning is an imp...

Research on Switch Machine Fault Diagnosis Based on Integrated Deep Learning

Objective To make full use of fault log data for diagnosing switch machine faults, a fault diagnosis method based on integrated deep learning is proposed. Method By analyzing the textual data of switch machine faults and...

Architecture Design Scheme of Signal Centralized Monitoring System Based on Cloud Computing Technology

[Objective] To meet the development needs of railway electricity work monitoring services and address issues such as high coupling degree, lengthy deployment time, and high construction and operational costs in conventio...

Analysis and Solution Schemes for Interference on Metro Signaling System Axle Counting Equipment

[Objective] During the system commissioning, train debugging and trial operation on Chengdu Metro Line 18, the axle counting equipment exhibits AIO (abnormal interference and occupation) due to various disturbances in di...

Overall Overhead Property Development Scheme of Partially Operating Co-site Parking Lot

[Objective] In order to fully utilize the increasingly scarce urban land resources of Suzhou and leverage its geographical advantages, taking Sangtian Island Co-site Parking Lot of Suzhou Rail Transit Line 2 and Line 6 a...

Download PDF file
  • EP ID EP727713
  • DOI 10.16037/j.1007-869x.2024.01.030
  • Views 17
  • Downloads 0

How To Cite

Tianrong SUN (2024). Structural Renovation Design Study for Shanghai Rail Transit Line 3/4 Joint-rail Project at Baoshan Road Station. Urban Mass Transit, 27(1), -. https://europub.co.uk/articles/-A-727713