Time Synchronization Scheme for Train FAO Signaling System
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 2
Abstract
[Objective] Time synchronization is the foundation for ensuring the coordinated linkage of sub-systems within the signaling system, which directly affects the punctuality and operational safety of trains, serving as the basis for achieving train FAO (fully automatic operation). Therefore, it is necessary to study the train FAO signaling system synchronization scheme. [Method] The role of time synchronization devices in the signaling system is introduced. A time synchronization scheme is proposed and explanation is provided for the scheme. [Result & Conclusion] The proposed time synchronization scheme is as follows: the communication front-end processer of the signaling system obtains a unified time source from the clock system through the network, and time services are provided only by the host of the communication front-end processer. The application server as the host of client synchronizing with the communication front-end processer, and only the application server host is used as the server to provide time services to the lower-level devices. The gateway server and various terminal devices synchronize with the time of the application server host, with the gateway server host serving as the clock source to provide time services to the lower-level devices. The ATC (automatic train control) on-board devices and DCS (data communication sub-system) devices serve as clients to synchronize the gateway server host time. The proposed scheme utilizes different synchronization methods for the internal and external environments of the signaling system, avoiding internal signaling system jumps caused by external clock jumps, ensuring the time synchronization accuracy of the equipment. The time synchronization accuracy can reach millisecond level, thereby guaranteeing the requirements for train FAO.
Authors and Affiliations
Qiguang HUANG, Yu LIANG
Problems and Optimization Suggestions for Metro Interval Evacuation Design under Flood Conditions
Objective Evacuation in metro interval under flood conditions is often overlooked in metro engineering design. Besides, currently there are no industry standards for such scenarios. Attention should be paid to this issue...
Cause analysis of Braking Noise of A Metro Project with Aluminum Disc
Objective In a certain project, significant noise is generated during the last braking parking phase, affecting the surrounding residents rest and passenger comfort due to noise pollution caused by braking. Therefore, it...
Causes and Countermeasures of Train Emergency Braking Failures under DRB Turn-back Mode on Xi’an Metro Line 14
Objective Under the DRB (driverless return button) mode on Xi’an Metro Line 14, the train emergency braking will occur after the train automatically switching its head car on the turn-back line, resulting in the train tu...
Research on Signaling System of City (Suburban) Railway Cross-line Operation to Intercity Railway
Objective City (suburban) railways are a weak link in the four-network integrated development of rail transit system in China. There is currently no unified understanding regarding their functional positioning and passen...
Prediction for Vibration Response of Railway Vehicle Air-conditioning Structure Based on Constraint Force
Objective The air-conditioning unit, as an essential equipment for passenger comfort regulation in vehicles, generates vibration from the compressor and fan during normal cooling operation. Excessive vibration can lead t...