Abstract

This paper deals with the determination of well placement at early stages using information of oil wells based on simulation runs, and it is the first part of a research work that only considers synthetic cases. Most of the information is sparse at early stages and the objective of an Exploration and Production company is to develop the field in order to have production as soon as possible. The challenge at early stage of production is to propose the position of wells to be drilled. However, due to the lack of information at the early field life, the problem becomes more challenging. The proposed methodology is based on the conclusions obtained by applying the procedure mentioned above in seven synthetic cases of a squared reservoir of 2700 x 2700 ft, under single phase flow of hydrocarbons through the porous media and corroborated with numerical reservoir simulations, called exhaustive methodology. A period of three months is used to update hydrocarbon production, which is a reasonable time period to have stabilized production. Production maps were generated by means of the Kriging approach, as well as the corresponding uncertainty maps. A good match was found for the analyzed cases. Keywords –

Authors and Affiliations

Antonio Sampayo-Trujillo, Her-Yuan Chen, Xuan Zhang

Keywords

Related Articles

Geotechnical Properties of Lateritic Overburden Materials on the Charnockite and Gneiss Complexes in Ipele-Owo Area, Southwestern Nigeria

The lateritic soils that overburden Charnockite and Gneiss Complexes in Ipele-Owo area of Ondo State, Nigeria are in great use for local construction. However, little is known of their engineering properties and suitabil...

Flexural Behaviour of High Performance Reinforced Concrete Beams Using Industrial Byproducts

In this study experimental investigations were carried out to explore the possibility of using Fly Ash, silica fume and metakaol in as a replacement of cement and bottom ash as a replacement of sand to make high performa...

Improvement on the Design,Construction and Testing of Hammer Mill.

This paper presents the result of work carried out in improving the design, construction and testing of hammer mill by addressing some lapses associated with the design and construction of the existing ones. These improv...

Performance of an Up-Flow Anaerobic Sludge Blanket Reactor (Uasbr) In the Treatment of Brewery Effluent

Brewery waste stream is a high biodegradable with BOD in the range of 2500 to 3500 mg/l and COD from 4600 to 7000 mg/l. This waste stream suffers substrate inhabitation in conventional biological treatment process. Up fl...

Thermal Behavior of a Horizontal Hollow Tile Submitted To a Sinusoidal Excitation

This work presents a numerical study, in a transient state, of the thermal behavior of a horizontal alveolar structure filled with air and vertically heated by a sinusoidal excitation applied to its superior surface. The...