A Health Management Scheme for Urban Rail Transit Signaling System Power Supply Incorporating Lithium Battery Management
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 11
Abstract
Objective To meet the reliability, maintainability, and safety requirements of the power supply for urban rail transit signaling system, and to enhance the stability of the signaling system power supply, it is necessary to incorporate lithium battery management in studying SPHM (signaling system power supply health management) scheme. Method With an introduction to the overall architecture of SPHM scheme, the architecture, functions, and functionality implementation of SPHM and lithium battery management systems are described respectively, and the interaction between them is elaborated. Result & Conclusion The SPHM system can monitor the real-time signaling power supply status, evaluate the health of various components, and send predictive alarms. The increase of signaling system power will lead to an increased demand for efficient backup energy storage. The lithium battery management system monitors the charging and discharging of voltage, current and temperature of the battery, implements protective measures, and estimates the SOC (state of charge) and lifespan using mathematical methods. The interaction between the two systems can effectively enhance the overall stability and safety of the signaling system power supply.
Authors and Affiliations
Lun PU
Operation Scheme for City Railway Train Considering Passenger Travel Time Value
[Objective] In view of the functional orientation of city railway and the inconsistency in passengers demand for travel convenience, ride comfort, and economy under the current economic and social development, it is nece...
Key Points in FAO System Integrated Technology Management
Objective To ensure the compatibility and consistency of functionality, requirements, and interfaces within FAO (fully automatic operation) system, it is necessary to design tasks for each key stage based on the characte...
Influence of Metro Shield Left/Right Line Tunnel Parallel Under-passing on the Defor-mation and Stress of Existing Open-cut Highway Tunnel under Deformation Joint Working Condition
Objective To ensure the successful implementation of metro shield tunnel parallel under-passing through the existing open-cut highway tunnel project under deformation joint condition, it is necessary to analyze the defor...
Analysis Model of Urban Rail Transit Service Quality Influencing Variable Factors Based on SEM
Objective Aiming to further enhance urban rail transit service with precision, it is essential to quantitatively extract the influencing variable factors of urban rail transit service quality and analyze the intrinsic re...
Operation Auxiliary Support System for FAO Lines Based on Key Operational Information
Objective Currently, FAO (fully automatic operation) line operational control commands are issued through independent specialized systems with no synergetic collaboration mechanism among them. To ensure consistency in in...