A Method to Address the Fixing of Sealing Deficiencies at the “Ostrovul Mic” Left Bank, “Râul Mare - Downstream” Water Development
Journal Title: HIDRAULICA - Year 2018, Vol 0, Issue 3
Abstract
The present paper proposes a method for approaching the remediation of sealing deficiencies from the left bank of Ostrovul Mic water reservoir at km1+300 (Raul Mare – Downstream water development) by executing a drain at the bottom of the side embankment downstream face. The results of the remedy are highlighted by checking the flow both as a permanent regime and as transitional regime hypothesis on a 2D numerical model.
Authors and Affiliations
Albert Titus CONSTANTIN, Gheorghe LAZAR, Alina-Ioana POPESCU-BUSAN, Serban-Vlad NICOARA
Simulation of an Electro-Hydraulic System for a P.E.T. Waste Baling Press
Energy efficiency is nowadays a key factor in designing industrial machinery, where digital technologies, modeling and simulation software environments are beginning to have a deeper impact. Smart technologies have enter...
Design and Optimization of Pressurized Toroidal LPG Fuel Tanks with Variable Section
This study addresses the design and optimization of the pressurized toroidal LPG fuel tanks with variable section used in automotive industry based on the finite element analysis (FEA) approaches, to model both thermal a...
Phenomenon of Transiency in Water Supply Systems
Transient is a flow condition in which velocity and pressure change rapidly with time. A transient normally occurs when a flow control component changes status and this change flows through the system as a pressure wave...
The Optimal CAD Design of a 3D Hexagonal Toroid with Regular Hexagonal Cross-Section Used in Manufacturing of LPG Storage Tanks
The objective in this paper is to optimal CAD design of a 3D hexagonal toroid with regular hexagonal cross-section used in manufacturing of LPG storage tanks used in automotive industry based on the finite element analys...
A Method to Address the Fixing of Sealing Deficiencies at the “Ostrovul Mic” Left Bank, “Râul Mare - Downstream” Water Development
The present paper proposes a method for approaching the remediation of sealing deficiencies from the left bank of Ostrovul Mic water reservoir at km1+300 (Raul Mare – Downstream water development) by executing a drain at...