Abstract
The number of nondominated points of multi-objective integer programming problems increases exponentially with the problem size. Therefore, finding all nondominated points is computationally hard and not practical for the decision maker. Instead of generating all nondominated points, it is reasonable to generate a set of points that represents the nondominated set with a desired quality level. In this study, we review the quality measures used to evaluate the representative sets and the approaches that generate representative points.
Authors and Affiliations
Banu LOKMAN
PRODUCTION LOGISTIC OPTIMIZATION WITH WCM METHODOLOGY AT A LEADING ICE CREAM MANUFACTURER
In the current system of a leading ice cream manufacturer, the production lines are fed by transpallets and this causes overstocks at the production stations with non-value added activities. The aim of the project is to...
ECZACIBASI HYGIENE PRODUCTS PRODUCTION AND INVENTORY PLANNING SYSTEM DESIGN
In this study, we design a production and inventory planning system which maximizes customer service level and minimizes total production related costs for Eczacibasi Hygiene Products factory. The system will make produc...
INVESTMENT ANALYSIS OF AN ENERGY SAVER DEVICE WITH EFFECTIVE ECONOMICAL FACTORS
To properly assess the investment decisions in the variable and risky manufacturing environment, these studies have to be improved with the help of scientific researches and analyses. An investment decision without using...
THE COMPARISION OF THE FACTORIAL DESIGN EXPERIMENT AND TAGUCHI APPROACH USING THE DATA OF A PRODUCTION COMPANY
In this study, 2k fractional factorial design experiment and Taguchi approach which are used in product design of a company are compared. According to conclusion of these methods as the system performance is at maximum,...
DEVELOPMENT OF A LOT SIZING AND SCHEDULING SYSTEM FOR AN AUTOMOTIVE SUPPLIER
In this study, lot sizing and scheduling problem is considered in an automotive supplier. As a result of the current system analysis, inappropriate mold-press machine assignments, quality losses due to these inappropriat...