Analisis Kinerja Alat Berat Pada Proyek Normalisasi dan Perkuatan Tebing Sungai

Journal Title: Sultra Civil Engineering Journal - Year 2022, Vol 3, Issue 1

Abstract

The purpose of this study was to analyze the performance of heavy equipment and the duration of time required to complete the Windo River Cliff Normalization and Reinforcement Project, Pamandati Village, Laeya District, South Konawe Regency. The results showed that the excavator's performance in excavation work (mechanical) was 38.68 m3/hour, dump truck 2.99 m3/hour. As for the embankment work imported from outside, the performance of the excavator is 98.53 m3/hour and the dump truck is 3.05 m3/hour. Where the duration of time required to complete the excavation work (mechanical) with an excavator is 12 days and for embankment work imported from outside is 2 days..

Authors and Affiliations

Ansar Jaya, Irwan Lakawa, Sitti Hawa, Muh Samtun Bona

Keywords

Related Articles

Kajian Infrastruktur Transportasi Darat Dalam Pengembangan Wilayah Kecamatan Tongauna Kabupaten Konawe

The development of rural areas from the agricultural base sector in the field of food through land transportation infrastructure is the main focus of this research. The location of the object of research was Tongauna Dis...

Analisis Kinerja Simpang Bersinyal Pada Simpang PLN Di Wua-Wua Kota Kendari

This study aims to analyze the degree of saturation of the signaled intersection at the intersection of PLN Wua-Wua Kendari, the long queue condition based on the Manual Capacity Road Indonesia (MKJI, 1997) method with d...

Korelasi Nilai CBR Dengan kepadatan Lapangan Subbase Course

The durability of the road flexural pavement structure is largely determined by the performance of each layer. One of these factors is the strength and resilience of the subbase. Compaction in accordance with applicable...

Modified Asphalt Mix Performance With The Addition Of Human Hair Waste

The development of road infrastructure in Indonesia is currently increasing, starting with new road construction projects to road improvement projects. To prevent premature damage to road pavements due to loading and the...

Cost analysis of Occupational Health And Safety (K3) on the Road Preservation (Case Study : Road In Kendari City – Kendari City Boundary)

The purpose of this study was to determine how much the application of K3 and to analyze the cost of K3 on the road preservation project within Kendari City - Kendari City boundary. The results showed that the level o...

Download PDF file
  • EP ID EP710756
  • DOI 54297/sciej.v3i1.239
  • Views 70
  • Downloads 0

How To Cite

Ansar Jaya, Irwan Lakawa, Sitti Hawa, Muh Samtun Bona (2022). Analisis Kinerja Alat Berat Pada Proyek Normalisasi dan Perkuatan Tebing Sungai. Sultra Civil Engineering Journal, 3(1), -. https://europub.co.uk/articles/-A-710756