Cost analysis of Occupational Health And Safety (K3) on the Road Preservation (Case Study : Road In Kendari City – Kendari City Boundary)
Journal Title: Sultra Civil Engineering Journal - Year 2022, Vol 3, Issue 2
Abstract
The purpose of this study was to determine how much the application of K3 and to analyze the cost of K3 on the road preservation project within Kendari City - Kendari City boundary. The results showed that the level of use of PPE in road preservation work in the city of Kendari did not meet the standards for the level of use of PPE / included in the less category. This is because the average value of the level of use of PPE in road shoulder work, asphalt Ac-Wc and Talud is 60%. The cost required for the implementation of Occupational Safety and Health (K3) on the Road Preservation project. The required K3 cost based on the unit price of the regulation is IDR 266,645,950.00 or around 2.17%, while the cost based on field prices is IDR 257,953,950 or about 2.10%. The percentage of K3 costs at the regulation price is greater than the percentage of K3 costs at field prices with a difference of 0.07% or Rp. 8,692,000.00.
Authors and Affiliations
Febrianti Usman, Sufrianto Sufrianto, Sitti Hawa, Andi Makkawaru Isazarny Jassin
Korelasi Nilai CBR Dengan kepadatan Lapangan Subbase Course
The durability of the road flexural pavement structure is largely determined by the performance of each layer. One of these factors is the strength and resilience of the subbase. Compaction in accordance with applicable...
Faktor- Faktor Yang Mempengaruhi Proses Pelaksanaan Pekerjaan Jalan Lingkar Kota Kendari II
Project delays can come from service providers or other users who have an impact on additional time and expenses beyond the plan. If the delay comes from the contractor (Contractor), the contractor may be fined, as well...
Analisis Produktivitas Tukang Batu Bata Pada Proyek Pembangunan Asrama Puteri Mandala Wangi 2 di Kota Kendari
Productivity is one of the fundamental factors that influences the ability of performance in the construction industry. Increased productivity will reduce work time, and will reduce costs, especially labor costs so that...
Analisis Pengembangan Sistem Distribusi Pada Sumber Mata Air Desa Lamendora Kecamatan Kapoiala Kabupaten Konawe
Water is an important component for the life of living things on earth and cannot be separated from the need for water. Water is the main requirement in the process of life on earth so that there is no life if there is n...
Penggunaan Limbah Nikel Sebagai Material Subtitusi Agregat Kasar Pada Beton K.250
The purpose of this study was to Analyze the characteristics of the aggregates used in concrete mixtures and analyze how much increase in compressive strength of concrete with a variation of nickel slag substitution 0%,...