Analysis on the Performance of New Mountain Gear Rail Train Brake
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 9
Abstract
Objective The maximum slope of the mountain gear rail line can reach 250‰. As the sliding force generated by the component of the gravity is much greater than the maximum friction force between wheel and rail, relying solely on the conventional wheel and rail braking system can not restrain the vehicle sliding when the vehicle runs on the maximum slope of the mountain gear rail line. Special gear rail braking device, which uses the gear rack engagement mode to brake the gear rail wheel directly, is needed to break the friction limit between the steel wheel and rail and provide greater braking force for the mountain gear rail vehicle running on the big slope. Analysis of the new brake performance is helpful to ensure the safety of the gear rail vehicle operation. Method The characteristics of the current special gear rail braking system for gear rail train in China and abroad are analyzed, and the advantages and disadvantages of the existing gear rail braking devices are summarized. According to the space and interface dimensions of the gear rail bogie, combined with the characteristics of the aircraft brake, a special brake for multi-friction disc gear rail on super large slope is designed, and its composition and performance are introduced. Theoretical calculation and finite element simulation are used to analyze the performance and component strength of the new brake, as well as its temperature changes under three worst working conditions. Result & Conclusion The new brake has good braking performance, and its highest temperature is lower than the bearing limit of the brake material in the worst working conditions. It can meet the braking requirements of the gear rail train under different braking conditions at maximum gradient (250‰).
Authors and Affiliations
Yin CUI, Changxiu LYU, Hongxing XU, Long HUANG, Chunyang LIU
Influence of Large-scale Foundation Pit Sloping Excavation on Adjacent Operating Metro Tunnel and Actual Measurement Analysis
Objective There are complex coupling effects between foundation pit and tunnel due to different construction processes. The foundation pit construction will inevitably cause disturbance to the existing operation tunnel,...
In-situ Protection of Underground High-voltage Cable Crossing Metro Foundation Pit
Objective With the increase in underground engineering projects, more and more projects are adopting in-situ protection technology targeting the issues caused by relocating urban underground high-voltage cables. Therefor...
Discussion on the Function and Interface Schemes for Interlocking System of Multi-level Railway Network Junction Station
Objective In the multi-level road network, junction stations of lines with different signal systems face quite a number of challenges. In order to meet the new demands of multi-network interoperation, it is necessary to...
Research on Brake Disk Heat Dissipation Rib Arrangement Spacing for High-speed Railway Train
Objective As the design speed of trains reaches 400 km/h level, the flow field environment under the train becomes more complex, highlighting the issues such as increased brake disc resistance and power consumption. It i...
Stability Analysis of Jinan Qixiuchang Metro Station during the Foundation Pit Temporary Supports Dismantling
Objective It is prone to lose stability, affecting the engineering safety in the process of dismantling the supports for metro station deep and large foundation pit. Therefore, it is necessary to analyze the stability in...