Assessment of Key Performance Indicators in Project Quality Plan for Construction Project

Journal Title: GRD Journal for Engineering - Year 2016, Vol 1, Issue 12

Abstract

Construction projects are a balance between cost, time and quality. It is possible to have high quality and low cost, but at the expense of time, and conversely to have high quality and a fast project, but at a cost. If both time and money are restricted, then quality is likely to suffer. High quality is not always the primary objective for the client; time or cost may be more important. It is only realistic to specify a very high standard of quality if the budget is available to achieve that standard. The need for KPI in construction projects has increased considerably in recent times due to significant changes, advancements in technology and high expectation of the users. The KPI maintain uniformity in construction process and ensure more economical utilization of materials resulting in significant reduction in cost to the users. This type of study has become necessary when the construction industry is encountering a quality issues day by day. Critical parameters or key indicators are necessary to introduce at planning stage when PQP is preparing which divert us to concentrate for quality. This study is carried out by questionnaire and Delphi techniques on quality of certain important activities. This study leads to know critical parameters or key indicators of an activity and their contribution. These indicators can be used for internal qualitative improvement which ultimately improves business, reputation.

Authors and Affiliations

Mr. Shahrukh S. Shaikh, Prof. Milind M. Darade

Keywords

Related Articles

Study of Tin and Cobalt Oxide Thin Film Prepared by Electrochemical Deposition by Two Electrode Configuration System

Thin film of Tin was prepared by using two electrode configuration electrochemical deposition techniques on stainless steel substrate. The bath for deposition film was aqueous containing 0.1 N SnCl2 (Tin Chloride) as pre...

Assessment of Mass Bathing On River Water Quality during Simhastha Mahakumbh Mela 2016 in Ujjain, Madhya Pradesh India

The primary aim of the study was to assess few impacts on River water quality of Mass gathering and taking a holy dip during Maha Kumbhmela from 22 april 2016 to 21 may 2016 in Ujjain City and to make a comparison of few...

Smart Trip Sharing: Android Application based on Locality

Smart Trip Sharing is an innovative platform that enables the users to find and coordinate trips with other people. Although a number of trips and travel facilitating applications like Thomas Cook, Yaatra.com exist, they...

Lung Pattern Classification for Interstitial Lung Disease using ANN-BPN and Fuzzy Clustering

The lungs are the primary organs of respiration in humans. The function of the respiratory system is to extract oxygen from the atmosphere and transfer it into the bloodstream, and to release carbon dioxide from the bloo...

Analysis of Carry Select Adder using Different Logic Styles

Carry Select Adder (CSLA) is one of the fastest adder used to perform fast arithmetic operations. In our project, a modified carry select adder is designed by using single Ladner-Fischer (LF) and binary to Excess-1 Conve...

Download PDF file
  • EP ID EP220952
  • DOI -
  • Views 130
  • Downloads 0

How To Cite

Mr. Shahrukh S. Shaikh, Prof. Milind M. Darade (2016). Assessment of Key Performance Indicators in Project Quality Plan for Construction Project. GRD Journal for Engineering, 1(12), 126-131. https://europub.co.uk/articles/-A-220952