A comparative analysis for improving the efficiency of 100MW Delta IV Ughelli gas turbine power plant is performed. The study used non-dominated sorting genetic and pattern search algorithms to minimize the objective function by optimally adjusting the operating parameters (decision variables). The adjusted operating variables were compressor inlet temperature (T1), compressor pressure ratio (rp), compressor isentropic efficiency (ɳic), turbine isentropic efficiency (ɳit), turbine exhaust temperature (T4) and mass flow rate (ma), fuel mass flow rate (mf) and fuel supply temperature (Tf). The ambient temperature and pressure were held constant at 304K and 1.01325bar respectively because of location limitation. The optimization code was written in Matlab programming language. The decision variables (constraints) were obtained randomly within the admission range. The GA and PS optimal values of the decision variables were obtained by minimizing the objective function. The determined GA and PS optimum operating variables have the same values which were rp = 9.76, ɳic = 86.40%, ɳit = 89.12%, T3 = 1481.8K, ma = 530kg/s, mf = 7.00kg/s. The total exergy destruction cost rate (CD) for PS and GAvaries by +0.00004% and the total investment cost rate Zk for PS and GA varies by +0.00038%. The results show that there is slight increase in total exergy destruction cost rate and total capital investment cost rate Zkin PS optimum when compared to GA optimum. This shows that GA is better than PS as an optimization algorithm

Authors and Affiliations

Ugwuoke Philip Emeka

Keywords

Related Articles

Uses and Comparison of Multi Input Converter Topology with Power Control

In this article a new topology is introduces which shows multiple energy sources input to a common load. But as we know about that all different type of energy sources have different voltage and current characteristic an...

Recent Trends in Energy Conservation Techniques

The process of liberalization of the Indian economy is rapidly progressing and it is expected to gather further momentum in the coming years. Thedemand for electricity is growing at a much faster rate than the generation...

Determination of Unit Fuel Cost Effect on Optimal Designed Parameters of Delta IV Ughelli Gas Turbine Power Plant Unit

The effect of variation on optimal decision variables with respect to unit cost of fuel (sensitivity analysis) for optimal performance of 100MW Delta IV ughelli gas turbine power plant unit was determined using optimal o...

Microgrid Battery Energy Storage Systems (BESS) Approach

Microgrid BESS may be the panacea that is being sought to relieve utility grids from ageing and demand stress. This solution can also work to enhance the durability of present grid structure while working to remedy forth...

Reactive Power Compensation and Power Injection through Distributed Generation Sources

Renewable energy resources are connected in distribution systems to achieving benefits. A control strategy to consummate favor from these grid-interfacing inverters when installed in 3-phase 4-wire distribution systems i...