DEVELOPMENT EQUATION FOR DETERMINATION THE START TIME OF SEEPAGE UNDER HYDRAULIC STRUCTURE RESTING ON SOIL CONTAINING A CAVITY

Abstract

This study aims to introduce a formula for determination the start time of seepage when single cavity presence at a specific location within the homogenous soil under a hydraulic structure. The investigation aims to observe the effect of cavity locations and size on the start time of seepage. The experimental work has been done in three stages, the first stage includes 36 models of 75mm in diameter cavity, while the second and the third stages includes eight models for each with 100mm and 34mm diameter of cavity respectively. The analysis of result shows that, generally, the effect of cavity was positive in term of increasing the time of starting the seepage. To generate the deterministic formula the SPSS statistical software was used and the results of multiple regressions are checked by statistical indices. By this process more realistic formula has been proposed with acceptable reliability.

Authors and Affiliations

Keywords

Related Articles

PECULARITIES OF REALITIES CONCEPTS VERBALIZATION IN MODERN GERMANLITERARY DISCOURSE

The article is devoted to the analysis of the modern German language means used in the process of CITY and TRANSPORT concepts verbalization, presented in contemporary art discourse. It is precisely contemporary art prose...

THE EFFECT OF SCHOOL LEADERSHIP AND PROCEDURAL JUSTICE ON CITIZENSHIP BEHAVIOR

Citizenship behavior is one of the most important factors that can support the objectives of organizations, may be influenced by leadership factor or justice felt by a teacher in the school. This research aims to know wh...

THE EFFECT OF PROMOTION AND PRODUCT QUALITY THROUGH PURCHASE DECISION ON THE CUSTOMER SATISFACTION OF BOHEMIAN PROJECT.ID PRODUCTS

This study aims to determine the effect of promotion and product quality through purchase intention on customer satisfaction of Bohemianproject.id products. The research conducted in Bandung on SMEs (Small and Medium Ent...

HSE MANAGEMENT SYSTEM AT HIGH ELEVATION IN SHIPBUILDING PROJECT

The Shipyard industry is one of the growing industry in Malaysia. There is still a lot of room for improvement with regards to the safety aspects within the industry. This study presents the finding of a survey on the sa...

EXPERIMENTAL STUDY AND ANALYSIS OF FLAT PLATE SOLAR WATER HEATER WITH PUMP

In this study, we are achieving the hot water from solar water heater. The solar water heater are archiving the solar radiation from sun energy after that we are obtaining the hot water, in this way we are obtained the v...

Download PDF file
  • EP ID EP425310
  • DOI 10.5281/zenodo.2432521
  • Views 107
  • Downloads 0

How To Cite

(2018). DEVELOPMENT EQUATION FOR DETERMINATION THE START TIME OF SEEPAGE UNDER HYDRAULIC STRUCTURE RESTING ON SOIL CONTAINING A CAVITY. INTERNATIONAL JOURNAL OF ENGINEERING TECHNOLOGIES AND MANAGEMENT RESEARCH, 5(11), 146-153. https://europub.co.uk/articles/-A-425310