Development of a model for determining a priority sequence of power transformers out of service

Abstract

<p>The research is devoted to the development of a model and algorithm for making decisions on determining the priority of power transformers out of service. Reducing the reliability of EPS operation, caused by the objectively existing aging of power transformer equipment, requires consideration of equipment significance when planning the power transformers out of service. For this purpose, it is proposed to use the theory of fuzzy sets and the Pareto method. The result of solving the optimization problem for multicriteria analysis is a vector of the best alternatives, built on the principle of dominance. The developed algorithm of complex simulation of the EPS state and technical condition of the power transformer for making decisions on the determination of priority of power transformers out of service allows for effective decision-making. The results of probabilistic and statistical simulation of EES states using the Monte Carlo method allow us to take into account the probabilistic nature of emergency situations in the EPS when determining its weakest elements that require priority replacement. The advantage of the proposed approach is taking into account the technical condition of electrical equipment for risk assessment of the EPS emergency situation. A comparative analysis of ranking results of power transformers based on the risk assessment of the EPS emergency situation confirmed the high efficiency of planning of EPS states when solving the problems of preventive control. The developed model will be used for further research and development of the algorithm for making effective decisions regarding the operation strategy of the power transformer and preventive control of the subsystem operation of the electric power system. The obtained results of complex simulation of the EPS state and technical condition of the power transformer give grounds to assert the possibility of software implementation of operation risk analysis of the electric power system for power supply companies.</p>

Authors and Affiliations

Eugen Bardyk, Nickolai Bolotnyi

Keywords

Related Articles

A method for determining information diffusion cascades on social networks

Information diffusion on social networks has many potential real-world applications such as online marketing, e-government campaigns, and predicting large social events. Modeling information diffusion is therefore a cruc...

Modeling the process of microbial biofilm formation on stainless steel with a different surface roughness

<p>This paper reports a study into the process of<strong> </strong>bacteria adhesion to surfaces of different roughness depending on sizes and shapes. It was determined that at the surface of stainless steel with a rough...

Determining the maximally permissible values for the indicators of insulation of sealed entrance bushings with a voltage of 110 kV using the method of minimal risk

<p>A method for determining the maximally permissible values for the indicators of insulation of high-voltage oilfilled entrance bushings that ensure the minimal risk value has been proposed. The proposed method differs...

Determining rational parameters of the capacitive energy storage system for the underground railway rolling stock

<p>An approach was proposed for determining rational parameters of the on-board capacitive energy storage for the underground railway rolling stock with recuperation systems. The essence of the approach is to determine t...

Obtaining the powder-like raw materials with the further research into properties of eggplant powders

<p>Results of the research into development of the advanced technological and technical solutions for the processing of eggplants are reported. The proposed technology resolves the task on the rational use of eggplants....

Download PDF file
  • EP ID EP528001
  • DOI 10.15587/1729-4061.2018.133570
  • Views 74
  • Downloads 0

How To Cite

Eugen Bardyk, Nickolai Bolotnyi (2018). Development of a model for determining a priority sequence of power transformers out of service. Восточно-Европейский журнал передовых технологий, 3(8), 6-15. https://europub.co.uk/articles/-A-528001