Evaluating the Outsourcing Performance in Implementing Development Projects Using Analysis of Hierarchical Process (AHP) Technique (Case Study: Mehr Housing Project)

Journal Title: International Research Journal of Applied and Basic Sciences - Year 2015, Vol 9, Issue 8

Abstract

The aim of the present study is to evaluate the outsourcing performance in implementing development projects using Analysis of Hierarchical Process (AHP) technique (case study: Mehr Housing project). Initially, criteria of performance valuation are identified in outsourcing process followed by categorizing these factors using AHP model method. The statistical population comprises of 66 mangers, employers, and engineers of Sardasht Mehr housing. Conesus method is used to choose the sample size. The study is that of survey and SPSS v22 software is employed to make statistical analysis. Results of the method show that reflectivity criterion is ranked as the first output level. Finally, a case study is conducted in Mehr housing project section and the data are analyzed. Using fuzzy hierarchical analysis method, options weight or outsourcing levels are determined and prioritized. Ultimately, appropriate level for activities outsourcing i.e. necessity of activities outsourcing is introduced as the study result.

Authors and Affiliations

Hiva Mohammadi| Department of Public Administration, Mahabad Branch, Islamic Azad University, Mahabad, Iran, Mehran Molavi| Department of Public Administration, Mahabad Branch, Islamic Azad University, Mahabad, Iran, email: dr_molavi1967@yahoo.com

Keywords

Related Articles

The study of green consumers’ characteristics and available green sectors in the market

Attention to environment has become a key element in political decisions and various organizations and associations have been formed along with a variety of laws and regulations for environmental protection. On the other...

Sustainable high-rise building (Case study: three example of sustainable high-rise building in Iran)

Due to the rapid growth of population and urbanization, the need to build high-rise buildings felt more than ever. This, along with the advancement of technology in various areas of construction could pave the way for st...

Identifying Smart Materials and Applying Them in Residential Spaces in Cold Climate Case Study: City of Hamadan

Today, supplying the energy needed by human being from renewable sources and reducing the consumption of nonrenewable energy are the main concerns for building designers and engineers. Modern technology has provided the...

The study of the Relationship between the Leadership styles of managers and Job Burnout of Technical-Vocational Education Centers Employees in the North of Iran

Job burnout is a prolonged reaction to the emotional and interpersonal chronic stressors at work. The most important conditions of job burnout are hypofunction, absenteeism, successive delays, various complaints, conflic...

The comparison of Emotional Intelligence among Active and Inactive Female Students

the aim of this research is to compare emotional intelligence among female athletes and non-athletes at the Chamran University of Ahvaz. This study is a descriptive survey conducted as a field study. The sample consists...

Download PDF file
  • EP ID EP7081
  • DOI -
  • Views 347
  • Downloads 20

How To Cite

Hiva Mohammadi, Mehran Molavi (2015). Evaluating the Outsourcing Performance in Implementing Development Projects Using Analysis of Hierarchical Process (AHP) Technique (Case Study: Mehr Housing Project). International Research Journal of Applied and Basic Sciences, 9(8), 1257-1262. https://europub.co.uk/articles/-A-7081