FACTORS AFFECTING THE OPERATING PARAMETERS OF PYROTECHNIC DELAY DEVICES
Journal Title: Problemy Techniki Uzbrojenia - Year 2016, Vol 140, Issue 4
Abstract
The paper analyses information available in literature on factors influencing the parameters of pyrotechnic delay devices (PDD). The literature includes research and development reports of mostly foreign origin. The main component of PDDs is a pyrotechnic delay charge (PDC) which may consist of one or more pyrotechnic delay mixtures (PDM). The use of appropriate PDM and maintaining its required parameters during service life decides about its usefulness for the ordnance. The paper describes the factors affecting the operation of PDDs. These factors are divided into internal ones, closely related to the structure of PDDs, and external ones. Described factors affecting the operation of PDDs were additionally illustrated by test results. Collected information can be useful for people involved in designing and testing the PDDs.<br/><br/>
Authors and Affiliations
Radosław Warchoł, Marcin Nita, Rafał Bazela
ASPEKTY BADAWCZE I WDROŻENIOWE ORAZ ANALIZA MOŻLIWOŚCI ZASTOSOWANIA 12,7 MM WLKM
W artykule przedstawiono syntetyczny opis wyników analiz wstępnych, zestawienia parametrów taktyczno-technicznych nowo opracowanego wielolufowego karabinu maszynowego WLKM w odniesieniu do będących w uzbrojeniu Sił Zbroj...
RESEARCH AND IMPLEMENTATION ASPECTS AND ANALYSIS OF APPLICATIONS FOR 12.7 MM WLKM
The paper presents a concise description of initial results of analyses and a list of tactical-technical parameters for a newly developed multi-barrel machine gun WLKM in reference to other types of weaponry being used b...
CONTROLLED ANTITANK MINES OF NEW GENERATION
The paper presents a System of Controlled Antitank Mines (SCAM) which is a world unknown solution of a concept of intelligent battlefield and is designed to build engineering dams. The mines have an innovative solution i...
ZAPEWNIENIE CYKLU ŻYCIA ŚRODKÓW BOJOWYCH
Zgodnie z Decyzją nr 78/MON Mi-nistra Obrony Narodowej z 3 marca 2006 r. (Dz. Urz. MON nr 4, poz. 53), procedury i działania związane z opracowaniem wyrobu, w szcze-gólności wyniki prac koncepcyjnych, wymagania bezpiecze...
LIFE CYCLE ASSURANCE POLICY FOR ORDNANCE
According to Decision of the Minister of National Defence No 78/MON from 03 March, 2006 (Official Diary of MoD No 4, pos. 53) the procedures and actions connected with development of products, including especially result...