Factors Affecting Time and Cost Overrun in Construction Projects
Journal Title: International Journal for Research in Applied Science and Engineering Technology (IJRASET) - Year 2017, Vol 5, Issue 6
Abstract
The Construction industry is one of the fast-growing industries in India and it contributes a lot on country’s economy. But the construction industry suffers from problems that affect time and cost. Successful completion of theö construction project is based on many factors among all time and cost is the most crucial factors. To manage these two things then the project would be successful. The factors that influencing time and cost overruns are identified from the literature and using these factors a questionnaire is prepared and it contains 42 factors which causing delay and cost overruns and these factors are distributed to engineers, contractors, and clients. The respondents were asked to rate the listed factors on the basis of occurrence and severity of the impact. Data received from the questionnaire was analyzed by using the statistical technique. The aim of this study is to identify the most critical factors responsible for the time and cost overrun of the construction project and suggest the remedial measures to the solution.
Authors and Affiliations
S. Uday Kiran
Design of Co-Ordinate Measuring System with Vision Inspection for Quality Control
Nowadays, image and video processing applications are becoming widely used in many domains including industrials, medical imaging, manufacturing, and security systems. Real time video processing is a very demanding task...
Differentiate Different Methodology for Design of Vedic Multiplier
Multiplier is one of the most important part in any processor speed which improves the speed of the operation for example in special application processors like Digital Signal Processor (DSPs). Basically, the operationa...
Chaos CDSK Communication System
In recent years chaotic communication systems have emerged as an alternative solution to conventional spread spectrum systems. The chaotic carrier used in this kind of modulation-demodulation schemes, have unique proper...
The Influence of Performance Management System on the Employee Turn over- an Empirical Study
This paper is an outcome of empirical study conducted at Sutherland Global Services Chennai in order to examine whether unsatisfactory performance management system is one among the root cause for employee turnovers hap...
slugDarshan: Electronics Guidance For The Navigation Of Visually Impaired Person
This paper presents Darshan a Navigation System for blind people to navigate safely and quickly, in the system an obstacle detection and recognition is done through ultrasonic sensors and USB camera. The proposed system...