Abstract

[Objective] Under the same power configuration, the cost of a permanent magnet synchronous traction system is higher than that of an asynchronous traction system. However, the former can effectively reduce the operational consumption of trains. Therefore, it is necessary to analyze the feasibility of applying permanent magnet traction technology in engineering projects. [Method] Taking the Nanjing Metro Line 9 as an example, a comparative analysis is conducted on the system configuration, operational energy consumption, and maintenance cost of permanent magnet synchronous traction system and asynchronous traction system. An improvement proposal is presented to change the train power configuration from 4M2T (4 motor 2 trailer) to 3M3T (3 motor 3 trailer), and a comparative analysis of the traction and braking performance of the two power configurations is performed. [Result & Conclusion] The 3M3T configuration with a permanent magnet synchronous traction system can effectively reduce the operational energy consumption of trains. It meets the operational requirements of Nanjing Metro Line 9 in terms of traction braking, fault operation performance, and rescue capabilities. Moreover, the overall life-cycle maintenance cost of the 3M3T configuration is relatively low. The research results indicate that, under permissible line conditions, cost control can be achieved by modifying the power configuration.

Authors and Affiliations

Dong LI

Keywords

Related Articles

Construction Technology for Shield Tunnelling Under-passing in Proximity to Operation Metro Tunnels in Water-rich Pebble Stratum

Objective In the process of shield construction under-passing the existing metro line in water-rich pebble stratum, irregular settlement of the overlying soil mass beyond control range may occur, potentially leading to i...

Asset Management Value Oriented Nanjing Metro Asset Information System Construction

[Objective] In the process of URT (urban rail transit) asset formation, there are challenges in the smooth transmission of asset information, leading to issues such as ′inconsistency between accounts and reality,′ diffic...

Safety Envelope Management Method for Marshaled Trains Based on Time Delay Protection

[Objective] In flexible marshaled trains, the communication delay between the master railcar, subordinate railcar and ZC (zone controller) exhibits asynchrony, leading to potential issues such as overlapping, misalignmen...

Prediction for Vibration Response of Railway Vehicle Air-conditioning Structure Based on Constraint Force

Objective The air-conditioning unit, as an essential equipment for passenger comfort regulation in vehicles, generates vibration from the compressor and fan during normal cooling operation. Excessive vibration can lead t...

Characteristics of Passenger Stagnation Behavior Spectrum Based on Monitoring Video Data at Ticket Gate in Urban Rail Transit Stations

[Objective] To scientifically set up the ticket gate, improve its actual passing capacity, and reduce the congestion risk caused by abnormal stagnation of the passengers, it is necessary to study the characteristics of p...

Download PDF file
  • EP ID EP730110
  • DOI 10.16037/j.1007-869x.2024.02.045
  • Views 18
  • Downloads 0

How To Cite

Dong LI (2024). Feasibility Analysis of Permanent Magnet Traction Technology on Nanjing Metro Line 9 Trains. Urban Mass Transit, 27(2), -. https://europub.co.uk/articles/-A-730110