Innovative ways to improve machines for preliminary work given the needs of the modern construction industry

Journal Title: Gіrnichі, budіvelnі, dorozhnі ta melіorativnі mashini - Year 2023, Vol 1, Issue 102

Abstract

The bulldozer-ripper is the main machine during preliminary work. The creation of high-performance machines is carried out in two direc-tions: the production of fundamentally new working elements and machines based on the use of fundamental scientific achievements and the improvement of existing working elements, and traditional type machines that are in operation. The creation of working elements for ripper-picks is a perspective development direction of machines designed for ripping frozen and hard soils. They would make it possible to significantly increase the productivity of ripping work through the rational use of the base machine traction force. We applied the superposition principle of the impact on the working medium of several factors concurrently for this, such as static and dynamic loads, through the energy accumulation and its subsequent use to create a high-speed power impulse on the cutting edge to ensure the preliminary formation of the compressed zone in the soil massif. This will lead to the power inten-sity reduction of the static load on the soil ele-ment separation.

Authors and Affiliations

Mykola Prystailo, Maksym Balaka, Valentyn Mozharivskyi, Volodymyr Drachuk, Ihor Honta

Keywords

Related Articles

Determination of dynamic loads in the crane suspension when lifting a load from a rigid base

Loading and unloading works are an integral part of the construction process. Cranes of various types were mostly use to perform these works. To ensure trouble-free operation and increase the reliability of cranes, when...

Review and analysis of software simulators for robotic information systems

The rapid development of educational technolo-gies requires the active involvement of new means and effective teaching methods. One of the innovative tools of learning in the field of robotics is the use of robot simulat...

Research on the change of the combined moment of inertia for two-link manipulator with angular coordinate system

The main of the problems of the development of two-link manipulators with an angular coordinate system is the lack of effective and universal control systems capable of implementing energy-intensive modes of movement. Th...

Mathematical modeling kinematics of double toggle jaw crusher

In this work, the problem of modeling the kine-matic parameters of a jaw crusher with a simple movement of the jaw was consider. The dynamic model of the jaw crusher was consider as a flat articulated-lever closed mechan...

Justification and static calculation of the adaptive moving counterweight of a single-bucket excavator

The results of an analytical study of the effect of loads on the equipment of a single-bucket excavator are presented, and an analysis of previous studies is performed. The work highlights that the work process of a uni...

Download PDF file
  • EP ID EP745294
  • DOI https://doi.org/10.32347/gbdmm.2023.102.0402
  • Views 1
  • Downloads 0

How To Cite

Mykola Prystailo, Maksym Balaka, Valentyn Mozharivskyi, Volodymyr Drachuk, Ihor Honta (2023). Innovative ways to improve machines for preliminary work given the needs of the modern construction industry. Gіrnichі, budіvelnі, dorozhnі ta melіorativnі mashini, 1(102), -. https://europub.co.uk/articles/-A-745294