Calculation of horizontal collective drainage pipelines of reclamation systems in the presence of a ground water level slope

Journal Title: Gіrnichі, budіvelnі, dorozhnі ta melіorativnі mashini - Year 2023, Vol 1, Issue 102

Abstract

The purpose of this work is to develop a method-ology for calculating the parameters of pressure horizontal collective drainage pipelines of recla-mation systems that operate in the presence of a ground water level slope. The presented materials are based on the re-sults of personal analytical studies of the main mathematical dependencies, which describe the pressure liquid flow in horizontal collective perfo-rated pipelines, which operate in the presence of the ground water level slope. System of two differential equations, which describe the liquid motion in a drainage pipeline with variable flow rate and the conditions of liq-uid entry from the surrounding soil through the walls of the pipe in filtration mode, is considered. The explored pipeline is laid in the presence of the ground water level slope. By introducing new variables, the original system and its solution is presented in a dimensionless form. In this case the solution of the system depends on the value of three main factors: the resistance factor of the collecting drainage pipeline "ζl"; the generalized parameter "A", which comprehensive-ly takes into account the structural and filtering characteristics of the stream; the ground water level slope «І». The analysis used the concept of an infinitely long drainage pipeline, which oper-ates in the presence of the ground water level slope, or, what is the same, an inclined pipeline with an infinite filtering capacity of the side sur-face walls. Relatively simple and easy-to-use ana-lytical dependencies were obtained on the basis of the conducted analysis. They allow to calculate the nature of the flow rate variations and pressure drop along the length. Corresponding graphic dependencies were con-structed to simplify the calculations. It is shown that the value of the geometric slope of the ground water level, along with the resistance fac-tor and the generalized parameter, significantly affects the calculated parameters of such pipelines.

Authors and Affiliations

Andriy Kravchuk, Oleksandr Kravchuk, Veronika Barladina, Vladislav Perebyinis

Keywords

Related Articles

Analysis of the principles of working load formation in power drives of construction machines and equipment

The purpose of the proposed article is the analysis of the principles of the formation of the workload on the executive bodies of construction machines and technological equipment, which is due to the need for their impr...

An overview of the constructions of conveyors for moving bulk materials, comparison and study of their parameters

The production of concrete mixes, along with their use in the production of building materials and structures, is one of the key processes in the construction industry during the construction, restoration and repair of b...

Innovative ways to improve machines for preliminary work given the needs of the modern construction industry

The bulldozer-ripper is the main machine during preliminary work. The creation of high-performance machines is carried out in two direc-tions: the production of fundamentally new working elements and machines based on th...

Design procedure of reach stacker control system

Reach stackers are efficient and maneuverable machinery for an overload of overall containers in cargo terminals and ports today. Such machinery design determines the practical interest of the engineering industry specia...

Experimental research procedure of roller forming unit

Experimental research is conducted followed by a comparative analysis of the results, which are obtained in the process of theoretical and experi-mental studies, to check the theoretical research adequacy of the roller f...

Download PDF file
  • EP ID EP745295
  • DOI https://doi.org/10.32347/gbdmm.2023.102.0501
  • Views 48
  • Downloads 0

How To Cite

Andriy Kravchuk, Oleksandr Kravchuk, Veronika Barladina, Vladislav Perebyinis (2023). Calculation of horizontal collective drainage pipelines of reclamation systems in the presence of a ground water level slope. Gіrnichі, budіvelnі, dorozhnі ta melіorativnі mashini, 1(102), -. https://europub.co.uk/articles/-A-745295