Calculation of horizontal collective drainage pipelines of reclamation systems in the presence of a ground water level slope

Journal Title: Gіrnichі, budіvelnі, dorozhnі ta melіorativnі mashini - Year 2023, Vol 1, Issue 102

Abstract

The purpose of this work is to develop a method-ology for calculating the parameters of pressure horizontal collective drainage pipelines of recla-mation systems that operate in the presence of a ground water level slope. The presented materials are based on the re-sults of personal analytical studies of the main mathematical dependencies, which describe the pressure liquid flow in horizontal collective perfo-rated pipelines, which operate in the presence of the ground water level slope. System of two differential equations, which describe the liquid motion in a drainage pipeline with variable flow rate and the conditions of liq-uid entry from the surrounding soil through the walls of the pipe in filtration mode, is considered. The explored pipeline is laid in the presence of the ground water level slope. By introducing new variables, the original system and its solution is presented in a dimensionless form. In this case the solution of the system depends on the value of three main factors: the resistance factor of the collecting drainage pipeline "ζl"; the generalized parameter "A", which comprehensive-ly takes into account the structural and filtering characteristics of the stream; the ground water level slope «І». The analysis used the concept of an infinitely long drainage pipeline, which oper-ates in the presence of the ground water level slope, or, what is the same, an inclined pipeline with an infinite filtering capacity of the side sur-face walls. Relatively simple and easy-to-use ana-lytical dependencies were obtained on the basis of the conducted analysis. They allow to calculate the nature of the flow rate variations and pressure drop along the length. Corresponding graphic dependencies were con-structed to simplify the calculations. It is shown that the value of the geometric slope of the ground water level, along with the resistance fac-tor and the generalized parameter, significantly affects the calculated parameters of such pipelines.

Authors and Affiliations

Andriy Kravchuk, Oleksandr Kravchuk, Veronika Barladina, Vladislav Perebyinis

Keywords

Related Articles

An overview of the constructions of conveyors for moving bulk materials, comparison and study of their parameters

The production of concrete mixes, along with their use in the production of building materials and structures, is one of the key processes in the construction industry during the construction, restoration and repair of b...

Design procedure of reach stacker control system

Reach stackers are efficient and maneuverable machinery for an overload of overall containers in cargo terminals and ports today. Such machinery design determines the practical interest of the engineering industry specia...

Development of the technology of restoration of the tail part of the body of the cutter of the road cutter

Purpose. The purpose of this work is to study the patterns of wear and develop a technology for restoring the tail part of the cutter body of the road cutter. They conducted an analysis of the wear of the cutters and fou...

Analysis of studies of stationary tower cranes under wind loads

Loading and unloading operations are an integral part of the technological process of construction. Cranes of various types are mostly used to per-form these works. In modern industrial and civil construction, tower cra...

Justification and static calculation of the adaptive moving counterweight of a single-bucket excavator

The results of an analytical study of the effect of loads on the equipment of a single-bucket excavator are presented, and an analysis of previous studies is performed. The work highlights that the work process of a uni...

Download PDF file
  • EP ID EP745295
  • DOI https://doi.org/10.32347/gbdmm.2023.102.0501
  • Views 1
  • Downloads 0

How To Cite

Andriy Kravchuk, Oleksandr Kravchuk, Veronika Barladina, Vladislav Perebyinis (2023). Calculation of horizontal collective drainage pipelines of reclamation systems in the presence of a ground water level slope. Gіrnichі, budіvelnі, dorozhnі ta melіorativnі mashini, 1(102), -. https://europub.co.uk/articles/-A-745295