Kebolehpercayaan & Kesahan Soal Selidik Kelewatan dalam Projek Pembinaan Menggunakan Model Pengukuran Rasch (Reliability & Validity of the Construction Delay Questionaire using the Rasch Mesurement Model)

Journal Title: Jurnal Kejuruteraan - Year 2017, Vol 29, Issue 1

Abstract

Construction industry is one of the industry that generates economy and at the same time provides job vacancy and national treasure. However, delay in construction project is a global phenomenon which occurred at almost every country, thus retards the development of the country. There are numerous of studies on construction delay using questionnaire done by researchers worldwide. Reliability and validity of the questionnaire should be reviewed in advance to ensure the effectiveness of the survey conducted. It is to obtain the appropriate data and the data can be used for futher analysing. The objective of this research is to get the reliability and validity of the questionnaire on construction delays projects using the Rasch measurement model. For purposes of data analysis, this research uses Winstep a software-based Rasch Modal measurement. Beside Cronbach alpha reliability, Rasch Measurement Model can provide the reliability of the item and respondent. Validity of data evaluated from various aspects, including the items and the respondent misfit, principal component analysis and rating scale. A total of 54 of the 64 items were identified contributed to delays in construction projects in Malaysia.

Authors and Affiliations

Muhamad Azry Khoiry, Noraini Hamzah, Wan Hamidon Wan Badaruzzaman, Norngainy Mohd Tawil

Keywords

Related Articles

Kajian Mikrostruktur Aloi Aluminium A390 Selepas Pemesinan Kisar (Microstructural Study of Aluminium Alloy A390 After Milling Process)

Aloi aluminum menjadi tumpuan dalam aplikasi komponen automotif disebabkan sifatnya yang ringan yang dapat membantu mengurangkan penggunaan bahan api. Umum mengetahui bahawa komponen ringan yang diperbuat daripada tuanga...

Development of Roundabout Delay Models Using Traffic Simulation Programs: A Case Study at Al-Mansour City, Iraq

Due to the increased number of vehicles, shopping centers and rapid growth population of Al-Mansour city, daily trips have been increasing besides generating traffic congestion in major roundabouts in the city. Those wil...

Pattern of Muscle Contraction in Car Pedal Control

Driver’s discomfort has gained a lot of attention, especially among interested parties. There are many interacting factors involving both the driver and the interior components of the car that contribute to discomfort wh...

Optimization of Stir Casting Method of Aluminum Matrix Composite (AMC) for the Hardness Properties by Using Taguchi Method

Aluminum matrix composite (AMC) was fabricated using stir casting with fly ash and SiC as reinforcing materials. In this work, Taguchi optimization technique was utilized to analyze the significant contributions of stir...

Effects of Sodium Sulfate and Sodium Chloride for Sonochemical Degradation on 1,4-benzoquinone and Hydroquinone in Aqueous Solution

1,4-benzoquinone, with the molecular formula C6H4O2, is generally known as a para-quinone. It is a six-member ring compound with an oxidized derivative known as 1,4-hydroquinone, which is a bright yellow crystal that has...

Download PDF file
  • EP ID EP417477
  • DOI 10.17576/jkukm-2017-29(1)-03
  • Views 174
  • Downloads 0

How To Cite

Muhamad Azry Khoiry, Noraini Hamzah, Wan Hamidon Wan Badaruzzaman, Norngainy Mohd Tawil (2017). Kebolehpercayaan & Kesahan Soal Selidik Kelewatan dalam Projek Pembinaan Menggunakan Model Pengukuran Rasch (Reliability & Validity of the Construction Delay Questionaire using the Rasch Mesurement Model). Jurnal Kejuruteraan, 29(1), 13-21. https://europub.co.uk/articles/-A-417477