MODEL RESEARCH ON THE EFFECTIVENESS OF TECHNICAL METHODS OF LIMITING THE EXPANSION OF THE DEPRESSION CONE CAUSED BY DEWATERING OF THE PLANNED GUBIN OPEN-PIT BROWN COAL MINE

Journal Title: Biuletyn Państwowego Instytutu Geologicznego - Year 2018, Vol 471, Issue 471

Abstract

Due to the planned exploitation of the Gubin lignite deposit by opencast method, a numerical hydrogeological model was built. The main goal of the model was to forecast the development of the cone of depression caused by the future mine dewatering. Due to the location of the mine near the Nysa Łużycka River, a drainage system will be developed. The main task of this system is to eliminate the development of the cone of depression in the upper Quaternary aquifer in Germany, as well as to protect the Natura 2000 areas located in the immediate vicinity of the mine against harmful effects on groundwater-dependent ecosystems. The modelling studies allowed analyzing the efficiency of slurry walls, deep barriers of recharge wells, and shallow soakaway systems for water from the future mine dewatering. It has been shown that in case of dewatering of a multi-layer aquifer complex with many hydraulic contacts, the use of slurry walls may be insufficient to limit the development of the cone of depression. However, the combination of slurry walls with the systems recharging the aquifers enables effective counteracting the negative impact of dewatering on the environment.<br/><br/>

Authors and Affiliations

Janusz Fiszer

Keywords

Related Articles

Metodyka modelowego bilansowania zasobów wód podziemnych w ich zlewniowym zagospodarowaniu

W systemie wodonośnym należy zidentyfikować warunki hydrodynamiczne oraz granice hydrostrukturalne jednostki bilansowej zbiornika wód podziemnych. W przypadku występowania kontaktów hydraulicznych z wodami powierzchniowy...

PROBLEMY PROSPEKCJI GEOFIZYCZNEJ PRZY WYZNACZANIU WYSTĘPOWANIA I GRANIC STRUKTUR HYDROGEOLOGICZNYCH DOLIN KOPALNYCH METODĄ ELEKTROOPOROWĄ

W artykule omówiono możliwości zastosowania badań geofizycznych – elektrooporowych – w zagadnieniach hydrogeologicznych dotyczących rozpoznania struktur hydrogeologicznych dolin kopalnych. Przedstawiono sposób organizacj...

GROUNDWATER MONITORING IN THE TRANSBOUNDARY ZONE WITH THE CZECH REPUBLIC IN THE KRZESZÓW–ŚCINAWKA–KUDOWA AREA IN THE HYDROLOGICAL YEAR 2009

Groundwater monitoring is carried out in the Czech–Polish transboundary area between Kamienna Góra, Wałbrzych and Kudowa in Poland and Trutnov, Broumov and Náchod in the Czech Republic. During the long-term joint Czech–P...

THE AGE OF MOLYBDENITES IN POLAND IN THE LIGHT OF Re-Os ISOTOPIC STUDIES

The paper presents the results of molybdenites that closely correlate with the Variscan granite intrusions in Poland. In the Karkonosze Massif and its eastern metamorphic cover, there are two separate stages of Re-Os age...

INTERACTION OF COAL MINING WASTES AND POWERPLANT COAL ASH AND ITS EFFECT ON THE PORE SOLUTION CHEMISTRY IN A DISPOSAL SITE

This study was aimed at elucidating the mode of interaction of coal mining waste and coal ash, exemplified in the Przezchlebie fly ash impoundment, where 12 years after closure, acidification of dewatered material and po...

Download PDF file
  • EP ID EP381740
  • DOI 10.5604/01.3001.0012.4737
  • Views 45
  • Downloads 0

How To Cite

Janusz Fiszer (2018). MODEL RESEARCH ON THE EFFECTIVENESS OF TECHNICAL METHODS OF LIMITING THE EXPANSION OF THE DEPRESSION CONE CAUSED BY DEWATERING OF THE PLANNED GUBIN OPEN-PIT BROWN COAL MINE. Biuletyn Państwowego Instytutu Geologicznego, 471(471), 23-32. https://europub.co.uk/articles/-A-381740