MÜDEK REPORT CARD: AN ALTERNATIVE MODEL FOR ASSESSMENT OF PROGRAM OUTCOMES
Journal Title: Endüstri Mühendisliği - Year 2019, Vol 30, Issue 1
Abstract
Accreditation for undergraduate engineering education has become an indispensable quality assurance tool for the engineering schools in a world with ever-growing competition. ‘Association for Evaluation and Accreditation of Engineering Programs’ (MÜDEK) is the authorized board for accreditation of engineering programs (First Cycle) in Turkey. It is essential to share experiences of success for the benefit of engineering schools either facing accreditation difficulties or going through the accreditation procedure for the very first time, notwithstanding the existence of engineering departments already familiar and confident with the process. We believe that the most challenging issue is to certify how the program outcomes have been achieved for the graduates through the application of objective performance evaluation tools. In this study, we introduce a novel integrated approach of micro and macro level modeling to be implemented for each graduating student for the purpose of attaining the goals of engineering education which is described with an experience of continuous improvement.
Authors and Affiliations
Nureddin KIRKAVAK, Hakan ÖZAKTAŞ, Mustafa Alp ERTEM
Explosive Compaction of Metal and Ceramic Powders: A Review of the Application of the Technique
Explosive compaction of metal and ceramic powders is based on the fact of using high shock wave presssure formed in a few microseconds after the explosion of the detonator in the compaction of powders. Explosive compacti...
MÜDEK REPORT CARD: AN ALTERNATIVE MODEL FOR ASSESSMENT OF PROGRAM OUTCOMES
Accreditation for undergraduate engineering education has become an indispensable quality assurance tool for the engineering schools in a world with ever-growing competition. ‘Association for Evaluation and Accreditation...
MAXIMIZATION OF WAREHOUSE STORAGE
The objective of this study is to ensure effective warehouse storage in face of ever changing customer demands, through providing maximum storage space and volume by calculating the space to be allocated in the warehouse...
PARALLEL PRODUCTION LINES WITH SEQUENCE-DEPENDENT SETUP TIMES AND SIDE CONSTRAINTS
We consider a scheduling problem observed in a soft-drink production facility with multiple production lines and sequence-dependent setup times. The primary objective is to obtain a weekly schedule that minimizes the tot...
A Maintenance-Oriented Assessment on Aging and Deterioration of Aircraft Cable System
The aging of electrical wiring interconnection systems (EWIS), a maintenance-focused assessment was conducted to determine the level of deterioration of the wire bundles/harness. In a typical aircraft, hundreds of thousa...