Multimodal Łódź Fabryczna Station
Journal Title: Technika Transportu Szynowego - Year 2018, Vol 288, Issue 4
Abstract
The reconstruction of the Łódź railway node, including the construction of an underground station in the city centre, gave the possibility of profound changes in passenger service of railway and bus long-distance and regional service. As a result, a large and modern multimodal node concentrating all means of transport was created in the city centre. The new station together with the surrounding road infrastructure was opened in December 2016. The assessment of the functionality of this station is the subject of this article.
Authors and Affiliations
Ewa Raczyńska-Buława
Środki ochrony przed porażeniem elektrycznym
The basic document for the traction power supply system process is Commission Regulation (EU) No 1301/2014 concerning technical specifications for interoperability of the energy subsystem. The regulation came into force...
Analiza strat energii w układzie zasilania wybranego odcinkatrakcji elektrycznej DC po jego modernizacji
The article presents the results of simulation studies on energy losses in the power system for a fragment of the DC electric traction route. The real section of the railway line and the electrical parameters of its powe...
Tabor kolejowy dla obsługi portów lotniczych
Istotnym problemem w zakresie obsługi logistycznej lotnisk jest zapewnienie efektywnego transportu pasażerów. Porty lotnicze są miejscami dużej koncentracji dróg transportowych służących ich obsłudze. Ich odpowiednie roz...
The ED250 (Pendolino) experiences in Poland – first years of exploitation
In December 2014 the first high-speed trains in Poland we introduced to regular operation. These trains based on the construction traction units ETR610 began operating on the routes between Warsaw and Gdansk, Krakow and...
Dworzec Łódź Fabryczna jako multimodalny dworzec centralny
The new history of a new Łódź railway station, its functions and surroundings has few milestones – in 2007 (concept), the feasibility study (2011) and the technical documentation (2013), than implementation stages (2012–...