Optimising the Design Process of the Injection Cam-shaft by Critical Path Method (CPM)

Abstract

In the present paper a series of advantages of the CPM method are presented, focusing on the optimization of design duration of an injection camshaft, by cost criteria. The minimum duration of finalizing the design of the injection camshaft will be determined, as well as the total cost associated to this project, normally, and then under crash regime. At the end, two types of sensitivity analysis will be performed: Meeting the desire completation time and Meeting the desired budget cost.

Authors and Affiliations

Olga-Ioana Amariei, Codruta-Oana Hamat, Vadim Chistruga

Keywords

Related Articles

Attenuation of Road Traffic Noise by Vegetation in Urban Spaces

The last decades of the 20th century and the beginning of the 21st century have been characterized by rapid urban growth of cities, which resulted in overcrowding and the lack of land. The aftermath of such circumstances...

Simple and Multi-collision of an Ellipsoid with Planar Surfaces. Part II: Example

This paper is a complementary one for our previous paper [25]. The collision of the ellipsoid is considered to take place with the main planes of the reference system. In our simulation we obtain the following results: n...

Experimental Measurements of Dynamical Wind Load acting on the Overhead Transmission Line

The detailed aim of the study is to determine the distribution of flow velocity, turbulence, the frequency of detaching vortices. These parameters are measured for conductor installed in the wind tunnel and it models the...

Tests Performed on Hydraulic Turbines at Commissioning or after Capital Repairs. Part I. Tests Per-formed on a 78-MW Francis Turbine

The paper presents the tests recommended by the standards to be per-formed on a hydraulic turbine on commissioning, after repair works or refurbishment, and the manner in which these tests were executed in a hydro power...

Stability Analysis for Hand-arm-forearm Dynamic System

In this paper we propose a model with four degrees of freedom for hand-arm-forearm dynamic system. Using experimental data from [9] by means of the Simulink program, is built block diagram to simulate the dynamic system...

Download PDF file
  • EP ID EP446763
  • DOI -
  • Views 106
  • Downloads 0

How To Cite

Olga-Ioana Amariei, Codruta-Oana Hamat, Vadim Chistruga (2016). Optimising the Design Process of the Injection Cam-shaft by Critical Path Method (CPM). Analele Universitatii "Eftimie Murgu" Resita. Fascicula de Inginerie, 23(1), 45-52. https://europub.co.uk/articles/-A-446763