Optimizing the Work Centers Loading Level

Journal Title: RECENT - Year 2015, Vol 16, Issue 46

Abstract

This paper present a new approach for optimizing the loading level of the work centers in a manufacturing system or supply chain. The loading level problem is solved when the following information is available: how many parts can be produced at each resource and from each material, considering the given time span, the routing file with more alternatives and the product mix based on the customer orders. In this paper, optimization is based on the adoption of matrix calculus combined with linear programming simplex algorithm. The opportunity of such a model is that the classic MRP data structure is directly manipulated with the purpose of obtaining the loading level and the production capacity. The results are used in the rough-cut capacity planning, budgeting process, and customer order confirmation. In addition, the facile integration in MRP systems is a vital point. The model was created also to serve a large variety of manufacturing systems.

Authors and Affiliations

Traian BUDA, Magdalena BARBU, Gavrilă CALEFARIU

Keywords

Related Articles

Corrosion Test of the Siliconized and Chromo-Siliconized Steels

The paper presents the results of the comparative study of the corrosion tests to the siliconized and chromo-siliconized steels. The thermo-chemical treatments were made in powder mediums. The corrosion tests were made i...

Lean Manufacturing Approach in Aircraft Maintenance Repair and Overhaul

This paper aims to give an overview of the LEAN approach and more specifically its application in an Aircraft Maintenance, Repair and Overhaul business. There are some examples provided to make the picture more understan...

Approximating Computer System Operation Technologies under External Action through the Brusselator Model with Perturbation in the Form of Dynamic Chaos

In this article, the research of the Brusselator mathematical model and its implementation in the form of the chaotic attractor is described. The hypothesis about the possibility of approximating computer system operatio...

Simulation of Double Acting Pneumatic Cylinder Control

Implementing optimal control in a pneumatic driven system is not a very cheap or easy process. The control subsystem of a pneumatic driven system has to distinctive direction: the control from pneumatic point of view and...

Theoretical Concepts on Supplier Agreement Management

Within the scope of the process improvement program it is intended to select suppliers according to defined criteria, to establish agreements with the supplier, to control the progress and to review and accept the result...

Download PDF file
  • EP ID EP90398
  • DOI -
  • Views 64
  • Downloads 0

How To Cite

Traian BUDA, Magdalena BARBU, Gavrilă CALEFARIU (2015). Optimizing the Work Centers Loading Level. RECENT, 16(46), 166-175. https://europub.co.uk/articles/-A-90398