Other Types of Equatorial Spherical Hypocycloid Automatic Machine
Journal Title: RECENT - Year 2011, Vol 12, Issue 32
Abstract
Equatorial spherical hypocycloid automatic machine, under equatorial and over equatorial was already identified as possible. Researches conducted so far by the author have focused exclusively on the equatorial spherical hypocycloid automatic machines (AHSe), particularly those with a 2:1 ratio between the numbers of teeth of the fixed plane central gear and the satellite gear. This research has, as results, two patent applications registered at OSIM. AHSe with one satellite and two or more trajectory generating points placed “externally” are similar as operation and construction of those with trajectory generating points placed “inside”. Location “on the outside” of the generating points may be favourable in terms of access to them and certainly determines an increase of distance between two neighbours slide blocks’ in conditions of the same angular space between them.
Authors and Affiliations
Răzvan RĂCEU
Heat Treatment for 20NiCrMo7 and 15CrNi13 Steels Used on Construction of Extralarge Bearings
This paper give an overview to the processes appeared in deep carburizing of elements produced with 20NiCrMo7 and 15NiCr13 steels used in construction of hollow rollers. The used software is specialized to simulate heat...
Students Allocation for Practicum
The goal of this paper is to propose criteria for students’ assessment for allocation of students for the practicum at the cooperating companies. Analysis of the up to now used way of allocation has shown that simple arr...
Tool Management in the Production System
The paper herein puts forth a few introductive notions connected to managing the tool flux within an enterprise. The notion of „tool flux” is defined, enhancing the differences from the material semi-manufactured product...
Automation and Evaluation of the Uncertainty in the Coordinate-Grid Method
A developed methodology for automated implementation of an experiment using the coordinate-grid method is applied. The presented experimental displacements obtained by means of a specialty designed program system are com...
Indicators of Innovation at Enterprise Level
In addition to current management activities (planning, scheduling, execution, control) to deal with the changes occurring in the market, the companies (its management) are obliged to make major changes or improvements,...