PARALLEL PRODUCTION LINES WITH SEQUENCE-DEPENDENT SETUP TIMES AND SIDE CONSTRAINTS

Journal Title: Endüstri Mühendisliği - Year 2017, Vol 28, Issue 4

Abstract

We consider a scheduling problem observed in a soft-drink production facility with multiple production lines and sequence-dependent setup times. The primary objective is to obtain a weekly schedule that minimizes the total weighted unsatisfied demand. As a secondary objective we aim to minimize the total production and setup times. The number of molds and the number of shifts at any day are limited. We formulate the problem as a Mixed Integer Linear Program and propose several heuristic procedures for its solution. The results of our extensive runs have revealed the satisfactory performance of our heuristic procedures.

Authors and Affiliations

Fatma Zeynep Sargut, Meral Azizoğlu

Keywords

Related Articles

A Maintenance-Oriented Assessment on Aging and Deterioration of Aircraft Cable System

The aging of electrical wiring interconnection systems (EWIS), a maintenance-focused assessment was conducted to determine the level of deterioration of the wire bundles/harness. In a typical aircraft, hundreds of thousa...

AN APPROACH FOR EXTENDING PROMETHEE TO REFLECT CHOICE BEHAVIOUR OF THE DECISION MAKER

In this study, an approach based on PROMETHEE is developed to correctly reflect the choice behavior of the decision maker that is not explained by the utility theory. The prospect theory argues that losses have higher im...

THE COMPARISION OF THE FACTORIAL DESIGN EXPERIMENT AND TAGUCHI APPROACH USING THE DATA OF A PRODUCTION COMPANY

In this study, 2k fractional factorial design experiment and Taguchi approach which are used in product design of a company are compared. According to conclusion of these methods as the system performance is at maximum,...

Explosive Compaction of Metal and Ceramic Powders: A Review of the Application of the Technique

Explosive compaction of metal and ceramic powders is based on the fact of using high shock wave presssure formed in a few microseconds after the explosion of the detonator in the compaction of powders. Explosive compacti...

MÜDEK REPORT CARD: AN ALTERNATIVE MODEL FOR ASSESSMENT OF PROGRAM OUTCOMES

Accreditation for undergraduate engineering education has become an indispensable quality assurance tool for the engineering schools in a world with ever-growing competition. ‘Association for Evaluation and Accreditation...

Download PDF file
  • EP ID EP631104
  • DOI -
  • Views 54
  • Downloads 0

How To Cite

Fatma Zeynep Sargut, Meral Azizoğlu (2017). PARALLEL PRODUCTION LINES WITH SEQUENCE-DEPENDENT SETUP TIMES AND SIDE CONSTRAINTS. Endüstri Mühendisliği, 28(4), 7-22. https://europub.co.uk/articles/-A-631104