Parameters and Technology of Experimental Blasts during Drilling of the Left Running Tunnel of the Metro in the City of Dnipro

Abstract

The problems of effective application of drilling and blasting operations during three experi-mental blasts in the Dnipropetrovsk subway tunnel are considered. The necessity of combined application of short-delay and delay blasting of the hole charges is substantiated to ensure a high level of basic indicators of driving and seismic safety for buildings and structures located near the object of the underground blast. It is proposed to carry out experimental blasts of cutting charges with their division into three groups from two charges in each, which are detonated in 20 msec. In addition, to increase the efficiency of the blast, were used the location of 9 uncharging holes between the cutting and auxiliary charges is applied. Calculations are given of the rates of displacement of soil particles and stresses arising in it during the blast, which do not exceed dangerous values on conditions of the seismic safety.

Authors and Affiliations

V. D. Petrenko, E. Shataikin, A. Shtandarin, O. L. Tiutkin, V. Kupriy

Keywords

Related Articles

Simulation of the traction current harmonic distribution from electrical rolling stock in asymmetric rail line

The investigation of the traction current harmonic distribution in rails from electrical rolling stock and their influence on the operation of track circuit's equipment is an important component of the general problem of...

Definition of the dependability index of power supply systems

The article shows that one of the important indicators of energy efficiency is the index (index) of dependability of electricity supply, which is characterized by a decrease in the share of dam-age from interruptions of...

Modeling of electromechanical systems

Real time systems mode and transmit data on the instantaneous state of the control objects can timely detect any faults and thus provide additional time for their correction by railway em-ployees. Turnouts are one of the...

Remote wireless radiation monitoring system

The remote wireless radiation monitoring system in the composition of four functional blocks is considered: the radioactive radiation sensor on the new dosimeter SBM-20; powerful micro-controller ChipKIT; cloud-based ser...

The problem of providing rolling stock stability in the railway

Actuality of work. The ability of railway transport to protect the lives of passengers, the safety of cargo and the environment as a whole determines its development and achievement of its leading positions in the transp...

Download PDF file
  • EP ID EP326320
  • DOI -
  • Views 126
  • Downloads 0

How To Cite

V. D. Petrenko, E. Shataikin, A. Shtandarin, O. L. Tiutkin, V. Kupriy (2017). Parameters and Technology of Experimental Blasts during Drilling of the Left Running Tunnel of the Metro in the City of Dnipro. Електромагнітна сумісність та безпека на залізничному транспорті, 1(13), 95-102. https://europub.co.uk/articles/-A-326320