Post-construction Foundation Pit Design at Interchange Hub and Impact Analysis on Surrounding Environment
Journal Title: Urban Mass Transit - Year 2025, Vol 28, Issue 3
Abstract
[Objective] The excavation work for the subsequent foundation pit at interchange hub area faces technical challenges such as highly sensitive surrounding environments, complex project boundary conditions, numerous construction constraints, and significant difficulties in protecting existing structures. Therefore, it is essential to analyze the design plan for the subsequent foundation pit at the interchange hub and its impact on the surrounding environment in depth. [Method] Using an open-cut underground space engineering project of high-speed railway and metro interchange hub located in deep silty soil layers for case study, the overall design scheme of the foundation pit is introduced. Finite element software is used to perform a 3D numerical simulation of the entire construction process, evaluating the potential impact of underground space construction activities on the surrounding existing structures. The simulation results are then compared with on-site monitoring data to verify the reasonableness of the design plan and systematically summarize the experiences gained during the design process. [Result & Conclusion] It needs to fully consider surrounding environmental conditions for the foundation pit project in the interchange hub area, the layout of individual buildings and excavation depth, coordinate the involved construction units, and prioritize the adoption of a co-construction plan to reduce temporary engineering work and maximize the interests of all parties. TRD (trench-cutting re-mixing deep wall method)+inserted steel bracing system performs excellently in water retention, and is suitable for foundation pit projects with moderate depth, thick permeable layers, complex surrounding environments, and stringent water retention requirements, where the water curtain must extend to the impermeable layer. Furthermore, the subsequent foundation pit construction at interchange hub should be fully integrated into the protection scope of the previously constructed individual buildings. Through scientific segmentation and excavation sequencing, the adverse impact on existing structures can be effectively mitigated.
Authors and Affiliations
Bo SUN
Coating Design Methods for Railway Transit Themed Trains in Large-scale Sporting Events
[Objective] With the increasing number of large-scale sporting events hosted in China, themed trains have gradually become an important medium for showcasing the image of the host city and the country. Research on the...
Signaling System Renovation Key Technology Solutions of Suzhou Rail Transit Line 11 and Line 3 for Through Train Operation
[Objective] To enable the through train operation between Suzhou Rail Transit Line 11 and Line 3, a customized signaling system upgrade solution is required based on the unique characteristics and operational demands o...
Duty Cycle Algorithm for 3D Cable Routing in Rail Transit Vehicles
[Objective] With the widespread application of rail transit vehicles such as high-speed and intercity trains, the increasing functional demands for these products have led to greater complexity in cable design. To enab...
Advanced Prediction Method for Shield Tunneling Cutterhead Torque Based on WaveNet Network
Objective Cutterhead torque is a crucial parameter that characterizes the safety of shield tunneling and the operating status of equipment. To address the difficulties in cutterhead torque prediction and excavation param...
Stress Characteristics and Design Optimization of Shield Initial Reaction Frame in Confined Space
Objective The size of the reaction frame is strictly constrained in shield tunnel initial operation under limited space environment. In view of this, to ensure the frame can withstand the huge reaction force generated du...