Praktyczne zastosowanie procesu oceny znaczenia zmiany i zarządzania ryzykiem

Journal Title: Technika Transportu Szynowego - Year 2018, Vol 289, Issue 5

Abstract

Contemporary approach to valuing transport based on a process approach determines safety as the overriding factor in assessing its proper functioning – safety management systems. The goal of security management is to eliminate, and if it is not possible, to limit the extent of damage that transport incidents can cause. Along with the development of this area, it is necessary to take into account all possible actions that are applied after the incident (reactive activities) and those that are implemented preventively on the basis of analysis of processes and risks (proactive activities) described in this publication. Increasingly, this analysis is also based on predictive actions that identify unlikely risks (most often a compilation of unlikely sources of risk) that cause catastrophic consequences. Risk management is one of the most important tools of modern systemic approach to process modeling. Generally, it may be described as a system of interrelated actions and decisions aimed at integration and coordination of processes in the organization, in cooperation with the external parties. The aim of management is therefore to improve the proficiency, effectiveness and efficiency of the operation and – in the case of risk management arising from the transport processes – to improve transport safety. The publication describes a proposal of risk management method in rail transport including analysis of areas threats to rail operations.

Authors and Affiliations

R. Wachnik, K. Chruzik

Keywords

Related Articles

Urządzenia ochrony zwierząt odpowiedzią na ogólnoświatowy problem kolizji pociągów ze zwierzętami

The probability of collisions with animals and their consequences depend on several factors, of which the speed and design of the train are very important. The problem of safety related to collisions concerns much more p...

Projektowanie rozwoju publicznego transportu zbiorowego w planach transportowych na przykładzie województwa pomorskiego

The dynamic development of individual motorisation causes a decrease in the number of passengers using public transport and a decline in the profitability of the communication lines. As a result, carriers providing servi...

Multifunctional hub Łódź Fabryczna

The new history of a new Łódź railway station, its functionsand surroundings has few milestones – in 2007 (concept), the feasibility study (2011) and the technical documentation(2013), than implementation stages (2012-20...

Niezawodność pracy sieci trakcyjnej a nowe rozwiązania konstrukcyjne

This article describes the basic structural elements of railway traction overhead contact line. These elements are associated with characteristic contact line failures. The causes of the damage and their consequences are...

Realizacja programu przygotowania i uruchomienia przewozów kolejami dużych prędkości

In the article a project genesis having its beginning in 90s of last age and discussed legal basis of the investment implementation within the TEN-T network was described. Subsequently the program’s material scope concer...

Download PDF file
  • EP ID EP499225
  • DOI -
  • Views 37
  • Downloads 0

How To Cite

R. Wachnik, K. Chruzik (2018). Praktyczne zastosowanie procesu oceny znaczenia zmiany i zarządzania ryzykiem. Technika Transportu Szynowego, 289(5), 34-41. https://europub.co.uk/articles/-A-499225