Abstract

[Objective] Due to the constraints of surface implementation conditions and underground space limitations, the implementation of underground utility tunnel in central urban area has poor feasibility. To address this issue, the concept of integrating the utility tunnel with metro system is proposed to achieve synchronized planning, design, and implementation, and to explore different modes of integrated utility tunnel and metro joint construction. [Method] The necessity and principles of utility tunnel and metro joint construction are studied, and the integrated construction of both is analyzed. Taking the joint construction project of Guangzhou central urban underground utility tunnel engineering and Guangzhou Metro Line 11 as example, the characteristics and applicability of different integration modes are analyzed from the perspective of land saving, construction difficulties, and coordination requirements. The applicability of joint construction modes is discussed based on typical cases and their practical implications. [Result & Conclusion] Integrating utility tunnel with metro system through synchronized planning, design and implementation can reduce land resource occupation and reasonably utilize underground space resources. Co-construction and co-structure are the preferred utility tunnel and metro joint construction modes, saving construction costs significantly and leveraging the benefits of joint construction to the maximum degree. The final determination of the integration scheme between the utility tunnel (shaft) and the main and ancillary structures of metro should be tailored to context-specific and comprehensive consideration based on actual site conditions.

Authors and Affiliations

Xingzhong NONG, Yi ZENG

Keywords

Related Articles

Safe Distances between High-Speed Railway 10 kV/0.4 kV Indoor Substations and Signal Rooms

[Objective] When railway 10 kV/0.4 kV indoor substations and signal rooms are constructed at the same location, electrical equipment and signal equipment arranged too far apart will waste land resources, while placing...

Construction Scheme and Influence Analysis of Shallow-Buried Large Diameter Steel Pipe Curtain

[Objective] The construction of shallow-buried pipe curtain structure may disturb the stratum and cause ground deformation. Therefore, it is necessary to study the influence of pipe curtain structure jacking sequence o...

Real-Time Compression Scheme for Urban Rail Transit Train Operation Data

[Objective] In view of the current challenges such as increased requirements for disk storage space, frequent disk damage and high bandwidth occupation existing in urban rail transit train operation data, research on d...

Artistic Construction of Metro Space Based on Architectural Environmental Psychology Theory

Objective Artistic atmosphere creation for the spatial scale, layout, shape, size and environment of metro station has great impact on passengers′ psychological and emotional effects. In order to improve passenger satisf...

Generalized Structural Design Scheme for Bogie Frame Assembly Welding Fixtures in Urban Rail Transit Vehicles

[Objective] Conventional assembly welding fixtures for vehicle bogie frames in urban rail transit do not meet the requirements for reducing production costs, simplifying operational difficulty, improving the utilizatio...

Download PDF file
  • EP ID EP727694
  • DOI 10.16037/j.1007-869x.2024.01.011
  • Views 49
  • Downloads 0

How To Cite

Xingzhong NONG, Yi ZENG (2024). Research on Integrated Urban Utility Tunnel and Metro Joint Construction Mode in Central Urban Area. Urban Mass Transit, 27(1), -. https://europub.co.uk/articles/-A-727694