Abstract
Objective In order to meet the demand for traction current collection in rail transit at the speed of 120 km/h and above, the research on high speed contact rail system is conducted and a complete optimization scheme is proposed. Method Based on the analysis of the influencing factors of shoe rail current collection, the idea about optimizing the quality of the high speed current collection is put forward. Optimization measures are proposed from the aspects of design, plane layout, construction and installation of the contact rail parts, and a complete scheme for the high speed contact rail system is formed. Two methods of reducing the ramp slope and adding elastic elements to the ramp support at the ends are adopted, aiming to reduce the impact force and prolong the action time for the shoe rail contact improvement. The insulation sectionalizer is used to replace the mechanical fracture. The elevation of the connecting passage is raised to be flush with the evacuation platform. The power section at the station end is laid out in the light of the turnout to reduce the quantity of contact rail fractures. The insulation span is appropriately shortened to reduce the deflection of contact rail. Modular assembly is adopted to improve construction accuracy of the contact rail. Result & Conclusion The above measures improve the current collection quality of the contact rail system, raising that of the contact rail at the speed of 120 km/h and above.
Authors and Affiliations
Qilai HUANG
Variable-position System for Balises in Automated Vehicle Depot
Objective The restriction and impact of balises in the maintenance trench of automated vehicle depots on vehicle maintenance grow increasingly prominent. Therefore, it is necessary to conduct a research on the variable-p...
Time Synchronization Scheme for Train FAO Signaling System
[Objective] Time synchronization is the foundation for ensuring the coordinated linkage of sub-systems within the signaling system, which directly affects the punctuality and operational safety of trains, serving as the...
Constitutive Model and Experimental Study of Stud Steel-Shotcrete Interface Bond-Slip in Mining Method Tunnel Initial Support
Objective It is aimed to elucidate the constitutive relationship of bond-slip at the interface between stud steel and shotcrete in the initial support of mining method tunnel. Method Four different working conditions are...
Impact of Metro Shield Interval Mechanical Method Connecting Passage Construction in Water-rich Sandy Stratum
Objective There is limited research on the impact of mechanical method connecting passage construction on mainline tunnels and surrounding soil of metro shield interval in water-rich sandy stratum. Method Taking a metro...
Span-height Aspect Ratio of Pre-stressed Reinforced Concrete Track Beams for Straddle Monorail with 1 250 mm Gauge and 25 m Span
[Objective] To adapt to the building characteristics of a new-model straddle monorail train, mechanical performance analysis and interface optimization research are conducted on a new type of PRCTB (pre-stressed reinforc...