Segmented Manufactured and Constructional Technology of Curved Single Steel Tower with Large Radian of Cable-stayed Bridge
Journal Title: 河南科技大学学报(自然科学版) - Year 2019, Vol 40, Issue 3
Abstract
Taking the construction of single tower steel tower of Guohe No. 3 Bridge in Anhui Province as engineering background, the outer radius of the upper tower is 148. 75 m, the inner radius is 153. 25 m, and the radius of the tower axis is 151 m. The main technical measures, such as the manufacture of steel tower column with large arc curve section, the lifting technology of steel tower column, and the control connection of arc tangent alignment in construction were studied. In view of the difficult problem of manufacturing and assembling steel tower due to the complicated structure of steel tower, the construction technology of curve alignment assembly of steel tower column with large size was studied. Control of top elevation and planar positioning assembly of sections T2 and below, the accuracy deviation are all not more than ± 2 mm. The assembly accuracy of segments above T2 is reduced. The vertical decreasing ratio does not exceed 1∶ 4 000.
Authors and Affiliations
Xiaomin LIU, Meng YANG, Bin LIANG
Effects of Additive Concentration on Pool Nucleate Boiling Heat Transfer of Lithium Bromide Solution
The effects of additive concentration on pool nucleate boiling heat transfer of 10%,20% and 30%mass fraction lithium bromide solution was studied with additives Triton X-100. The measurement results show that this additi...
Laboratory Test of Silt Clay Consolidation by Vacuum Preloading
The consolidation effect of soil after vacuum preloading method was very different by depth. In order to explore the reason of vacuum degree loss during vacuum transfer via vacuum preloading method,the silt clay was used...
Design and Realization of Mars Rover's Mobile System
Based on the opitimization design of system configuration,rover wheels and drive joints,a new type of mobile system of Mars rover was elaborated. By means of single-wheel platform experiment and overall system performanc...
Behaviors of Associated Arc and Its Influences on Sliding Current Carrying Friction
In order to solve the problem that the great impact of associated arc on the current-carrying friction process was difficult to evaluate, the behavior of single associated arc and its impact on the current-carrying frict...
Analysis of Vertical Bearing Capacity of Super-long Pile Foundation of Main Tower of Cable-stayed Bridge in Offshore Silt Area
Taking the main tower pile foundation of the 228 National Highway Qimen port extra large cablestayed bridge project as research object, the bearing capacity of the super long pile foundation was analyzed with MIDAS-GTS N...