Settlement Control Techniques for Urban Rail Transit Station Entry/Exit Large Profile Pipe Jacking Engineering through Urban Roads

Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 4

Abstract

Objective To ensure the smooth implementation of urban rail transit station entry/exit pipe jacking construction project, it is essential to study the impact of ground settlement and explore settlement control measures for its engineering through urban roads. Method With reference to the long-distance bus station entry/exit pipe jacking engineering on Jinan Rail Transit R2 Line , and based on the description of project geological conditions and key difficulties, a 3D numerical calculation model for large profile pipe jacking engineering through urban roads with dense underground pipelines is established. Land subsidence curves at different distances from the excavation face and settlement curves at different depths of the soil layer are obtained. A comparison is made between the simulated vertical displacement values of land monitoring points above the pipe central axis and the field-measured values changing with excavation distances. Corresponding construction optimization measures are proposed, and the optimization effects are analyzed and verified based on field-measured data. Result & Conclusion During the jacking process, as the distance from pipe central axis increases, the land subsidence gradually decreases. With increasing depth, the deep layer displacement of the soil layer gradually increases, and the settlement curve gradually transitions from ′stout and short′ to ′slender and tall′. Factors such as significant fluctuations in soil chamber pressure and frictional disturbance between the pipe and the stratum on-site lead to an outcome of the maximum simulated settlement, which is slightly less than the maximum field-measured settlement, posing certain discrepancy. By adopting measures such as controlling excavation speed and rational grouting for reducing friction, the subsequent construction settlement control effect is evident, with a maximum land subsidence of 18.18 mm, and the deformation is within construction allowable range.

Authors and Affiliations

Huitang XING, Hao LIU, Dong WANG, Pengfei LI, Hua ZHOU, Yan ZHANG

Keywords

Related Articles

Real Time Planning Algorithm of Automatic Train Driving Based on Global Optimization

Objective The existing target speed planning algorithm for the automatic driving of urban rail transit train cannot handle in real time the temporary change of the line speed limit in case of emergency due to the large c...

Influence of Vertical Ground Motion on Seismic Response of Subway Station Co-structure System

Objective The co-structure system of subway station (hereinafter referred to as 'co-structure system') realizes the connection and conversion between the box structure and the box frame structure through thick plates. Du...

Management Model of Smart Stations under Urban Rail Transit FAO Conditions

[Objective] In order to further explore the production operation and business management model in line with the actual operation of urban rail transit, ensuring the scientific process and optimization of the station ma...

Stability Analysis of Jinan Qixiuchang Metro Station during the Foundation Pit Temporary Supports Dismantling

Objective It is prone to lose stability, affecting the engineering safety in the process of dismantling the supports for metro station deep and large foundation pit. Therefore, it is necessary to analyze the stability in...

Overall Overhead Property Development Scheme of Partially Operating Co-site Parking Lot

[Objective] In order to fully utilize the increasingly scarce urban land resources of Suzhou and leverage its geographical advantages, taking Sangtian Island Co-site Parking Lot of Suzhou Rail Transit Line 2 and Line 6 a...

Download PDF file
  • EP ID EP734179
  • DOI 10.16037/j.1007-869x.2024.04.033
  • Views 41
  • Downloads 0

How To Cite

Huitang XING, Hao LIU, Dong WANG, Pengfei LI, Hua ZHOU, Yan ZHANG (2024). Settlement Control Techniques for Urban Rail Transit Station Entry/Exit Large Profile Pipe Jacking Engineering through Urban Roads. Urban Mass Transit, 27(4), -. https://europub.co.uk/articles/-A-734179