Overall Overhead Property Development Scheme of Partially Operating Co-site Parking Lot
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 2
Abstract
[Objective] In order to fully utilize the increasingly scarce urban land resources of Suzhou and leverage its geographical advantages, taking Sangtian Island Co-site Parking Lot of Suzhou Rail Transit Line 2 and Line 6 as an example to propose an OOPD (overall overhead property development) scheme of partially operating co-site parking lot. [Method] A necessity and feasibility analysis is conducted on the co-site parking lot OPD scheme. The schemes of parking lot reconstruction general plan, demolition and renovation technology, and operation transition technology are introduced. The economic indicators of Sangtian Island Co-site Parking Lot overhead property reconstruction are analyzed. [Result & Conclusion] The proposed co-site parking lot OOPD scheme includes carrying out the general layout and design of Line 2 Sangtian Island Parking Lot according to the reserved OPD conditions, reserving column space for OPD, demolishing and renovating existing parking lot after the new Line 2 long-term parking lot is built. The proposed co-site parking lot OOPD scheme can effectively improve the co-site parking lot engineering compatibility of the existing line operation during transition period and the new parking lot, minimize the impact on existing line operation, implement the construction process of building followed by demolishing, for the reduction of engineering waste and lower construction costs.
Authors and Affiliations
Shuo FANG
Manufacturing Process of Straddle Monorail Beam-switching Turnout
[Objective] Due to the diverse components, complex internal structures, and significant deformation risks of straddle monorail beam-switching turnout, issues such as improper component installation, welding-induced therm...
Pressure Wave Control Scheme for Metro Vehicle at Speed of 120 km/h
Objective With the increasing demand for passenger comfort in urban rail transit, pressure wave control inside metro trains at speed of 120 km/h and above has become a an essential function of train air-conditioning syst...
Research and Engineering Application of Key Waterproof Technology for Underground Stations with Assembled Superposed Structure
[Objective] Underground stations constructed in soil and rock layers are subject to long-term groundwater erosion and pressure infiltration. If waterproofing measures fail, water leakage issues may arise. Such leakage...
Reflections on Promoting Urban Rail Transit Sustainable Development in New Era
Objective URT (urban rail transit) development in China is at the 'crossroad', requiring both seeking good strategies for gradually alleviating the financial pressure on the existing city construction and operation and f...
Study on Lightweight and Sound Insulation Characteristics of Aluminum Profile Structure Parameters for Metro Train Floors
Objective Developing lightweight and low noise is a current trend in rail transit. Achieving lightweight and low-noise design of metro train floor profiles is of significant importance for improving passenger comfort. Me...