The Method of Multi-criteria Analysis to Support the Decision on Load or Micro-generation Connection to a Low- or Medium-voltage Power Grid
Journal Title: Acta Energetica - Year 2016, Vol 26, Issue 1
Abstract
This paper presents a method that supports the decision in terms on selecting the best option of a load connection to a low- or medium-voltage power distribution grid, and of a micro-generation source connection to a low-voltage grid. The method is based on the search for the option with the lowest aggregate assessment measure, which is the weighted average of partial assessment measures determined for each of eight considered criteria. For each of the first three, economic criteria, partial assessment measure was calculated using the normalisation method. For each of the other five, technical criteria, we developed a relative measure of the distance of the indicator from the threshold (e.g. the ratio of voltage drop in power supply line nodes in relation to its permissible value). This algorithm rejects variants whereby the thresholds set for partial criteria were exceeded in the time period of load/micro-generation source connection. The method was implemented in an MS Excel workbook and used to analyse complex problems of load or microgeneration source connections.
Authors and Affiliations
Paweł Bućko, Jerzy Buriak, Krzysztof Dobrzyński, Marcin Jaskólski, Piotr Skoczko
Application of Voltage-regulating and Phaseshifting Transformers to Control Power Flows in the Power System
Transmission system performance results from, among other factors, the use of devices for electricity transmission and transformation. Proper operation and control of these devices allows maintaining proper electricity p...
Ways of Improving the Reliability of Supply of Selected Important Municipal Customers in Municipalities
This paper reviews the most important ways to improve the reliability of supply of consumers, i.e. the increase in the number of directions of supply, use of grid and system automatic controls, and installation of distri...
Operational Parameters of Low Power ORC Biomass Plant
This paper describes a power plant with electrical/thermal capacity of 750 kW/3.4 MW launched in February 2015 by a private investor in Żory, Poland. The ORC Organic Rankine Cycle technology used there enables turbine op...
Maximisation of Combined Cycle Power Plant Efficiency
The paper presents concepts for increasing the efficiency of a modern combined cycle power plant. Improvement of gas turbine performance indicators as well as recovering heat from the air cooling the gas turbine’s flow s...
Dynamic Rating of 110 kV Overhead Lines
The paper justifies the need of using, within the 110 kV networks, a dynamic line rating model along the power lines. The work describes in detail the way in which the dynamic line rating is determined, basing the proces...