Time and Cost Optimization of Construction Project Using Mivan Technology

Abstract

Construction is one of the significant sectors and integral part of Indian economy. Also, it is of the important parameter in development of country. India is desperately planning for rapid manufacturing and creation of dwelling units for economical construction facilities Formwork enables to cast and construct the important elements and components of any construction facilities, which are required to be strong and effectively handle the structure. Mivan is comparatively a new construction technology upcoming for successful completion of mass project especially repetitive in nature. In this paper we have discussed about cost as well as time comparison of mivan technology with conventional formwork technology. The Mivan technology is appreciably efficient with cost, quality and time saving as compare to conventional one. The basic ideology is to reach a sturdy conclusion regarding the superiority of the two techniques over another.

Authors and Affiliations

Akshay Gulghane, Nikhil Pitale, Sanket Sanghai

Keywords

Related Articles

Study of Aircraft Wing with Emphasis on Vibration Characteristics

It is essential that the structural stability of the aircraft wings is a major consideration in the design of the aircraft. Many studies are being carried out for the design of the wings across the globe by the researche...

Survey on Copyright Protection in Peer To Peer Network

Recently, P2P technology has become so popular that a large number of files are being exchanged by millions of users concurrently. However, due to the significant growth of P2P file sharing, even copyrighted files are al...

User behaviors attributes of database anomaly detection model

This paper includes the description of designing a data-base anomalydetection system, whichis capable of being more precisein depictingthe behaviors of individuals and improving data-base abnormaldetecting correctness. I...

Thermodynamic Assessment of the Fe-B System in the Ssol5 and User Databases

Thermodynamic assessment of Fe-B system, including phase diagram, Gibbs energy, enthalpy, heat capacity and activity, was performed in the ThermoCalc software ver. 4.1 (Sweden). Two databases were used: the commercial SS...

A Review of Various Face Detection Methods

Skin identification assumes an imperative part in an extensive variety of image processing algorithm applications extending from face detection, tracking, and content-based image retrieval, gesture detection, and facial...

Download PDF file
  • EP ID EP395048
  • DOI 10.9790/9622-0808027074.
  • Views 158
  • Downloads 0

How To Cite

Akshay Gulghane, Nikhil Pitale, Sanket Sanghai (2018). Time and Cost Optimization of Construction Project Using Mivan Technology. International Journal of engineering Research and Applications, 8(8), 70-74. https://europub.co.uk/articles/-A-395048