A Mix Integer Programming Model for Parallel Machine Scheduling Problem: Using Shared Resource

Abstract

In parallel machine scheduling problems, if jobs have shared resources, it is not possible to schedule these jobs at the same time. For instance, if same mold are used for producing two different plastic parts, one of the parts has to wait until the end of other part’s process. In production systems including parallel machines, in general, jobs use shared resources like mold, crane etc. In this study, an identical parallel machine scheduling problem with shared resources is considered. A mixed-integer programming model is developed for considered problem. The solving performance of proposed model by GAMS/Cplex solver was tested using randomly generated small and large-sized instances.

Authors and Affiliations

Emine AKYOL, Tuğba SARAÇ

Keywords

Related Articles

Real-time monitoring of medical data via GPRS

In this study, an embedded real time system was designed for the mobile phone to telemonitoring and checking the status of patients. The ECG, Oxygen Saturation in arterial blood and blood pressure signals were transferre...

THE DEVELOPMENT OF MUTUAL INDUCTANCE COMPUTATION TOOL FOR WIRELESS POWER TRANSFER

Wireless power transmission systems, which aim to eliminate cable complexity and the difference between the connection terminals of devices, are now widely used in many areas such as mobile phone, toothbrush, shaver and...

Next Generation Emergency Call System For Turkey

Next Generation Emergency Notification System after emergency call (eCall) equipped vehicle regulations with the legislation EU-2015/758 will be an obligation in EU in 2018 and eCall units are set up into the vehicles in...

The Performance Evaluation of Solar Control Methods in Buildings: A Multi-Objective Approach

In this study, a tool and method that support the analysis of different solar control methods in buildings through a genetic optimization algorithm are proposed. First, eight scenarios of different glazing alternatives a...

Microstructure and Mechanical Properties of API 5L X70 Grade Steel Pipes Produced by Submerged Arc Welding Method

In this study, API 5L X70 steel roll materials welded via submerged arc welding technique (SAW). Macrostructure, microstructure and mechanical properties of welded samples were investigated. Tensile, hardness, Charpy imp...

Download PDF file
  • EP ID EP484330
  • DOI -
  • Views 91
  • Downloads 0

How To Cite

Emine AKYOL, Tuğba SARAÇ (2017). A Mix Integer Programming Model for Parallel Machine Scheduling Problem: Using Shared Resource. Gazi Üniversitesi Fen Bilimleri Dergisi Part C: Tasarım ve Teknoloji, 5(3), 109-126. https://europub.co.uk/articles/-A-484330