DETERMINATION OF THE STRUCTURE OF CONSTRUCTION WORKS ON THE RECONSTRUCTION OF SEPARATE STATIONS WHEN INTRODUCING A HIGH SPEED MOVEMENT

Abstract

For a successful integration into the world community of transport Ukraine should be among the countries with the existing highways, which requires to continue relevant research, which started in the late 60-ies of the last century. Known theoretical developments now require adjustments to meet modern conditions due to changes in the rules for the design of railway stations, the ratio of the quantities of capital and operating costs. The scope of work being carried out at interstations when preparing for high-speed railway service depends on many factors. The main ones of these factors are a layout of backbones both at accessibilities and within the bounds of an interstation, a quantity of receiving-and-departure tracks, a disposition of the facilities for passenger service, and others. The structural arrangement of constructional activities as a part of an interstation with corresponding gridiron of tracks preparation for high-speed passenger service is defined in this article. Besides, the existence of tracks with a small radius of curvature poses a major obstacle while preparing a chain path for high-speed service. The search procedure of the optimized radius of circular curve at a maximum speed is offered in this paper.

Authors and Affiliations

Maxim Kutsenko, Anna Shapoval, Alina Ivashkina, Yana Shkarbul, Yevheniya Lysenko

Keywords

Related Articles

ANALYSIS OF SCHEME OF COMPENSATION OF REACTIVE POWER IN THE SYSTEM OF TRACTION POWER SUPPLY

The article analyzes the existing methods and systems of reactive power compensation in the traction power supply system. The problem of reactive power compensation has always occupied an important place in shaping the e...

TECHNOLOGICAL SOLUTIONS FOR OPTIMIZATION OF MATERIAL AND LABOR COSTS AT THE ANKEROUS INSTALLATION WORKS WITH THE USE OF ACRYLIC COMPOSITIONS

The results of the study of the influence of organizational and technological factors on the duration of installation in concrete of chemical anchors using acrylic compositions and the conditions for the execution of wor...

THE SUBSTANTIATION OF THE TACTICS OF ORGANIZATION OF THE REPAIR OF THE EQUIPMENT OF THE STP FOR EXTENSION OF THE TERM OF ITS OPERATION

The article is devoted to the questions of definition and justification of the tactics of organization of repair the equipment of locomotives on the basis of optimization of the reduced expenses for its carrying out. Tog...

THE INFLUENCE OF MULTICOMPONENT ADDITIVES ON EFFECTIVE VISCOSITY OF THE MECHANICALLY ACTIVATED CEMENT SUSPENSIONS

The questions of influence of prescription factors (microsilica, superplasticizer Super PK, polypropylene fiber) on changing of effective viscosity mechanical activated cement containing suspensions that are using in tec...

RESEARCH EFFECT OF THE RESERVE TIME RELIABILITY HIGHT SPEED TRAIN SCHEDULE

The work is devoted to research the effect of reserve time between trains on the reliability of the train schedule. In terms of implementation speed movement in Ukraine determination of this value is of particular releva...

Download PDF file
  • EP ID EP321804
  • DOI 10.18664/1994-7852.173.2017.118193
  • Views 76
  • Downloads 0

How To Cite

Maxim Kutsenko, Anna Shapoval, Alina Ivashkina, Yana Shkarbul, Yevheniya Lysenko (2017). DETERMINATION OF THE STRUCTURE OF CONSTRUCTION WORKS ON THE RECONSTRUCTION OF SEPARATE STATIONS WHEN INTRODUCING A HIGH SPEED MOVEMENT. Збірник наукових праць Українського державного університету залізничного транспорту, 173(7), 29-35. https://europub.co.uk/articles/-A-321804